Each year, when the calendar strikes August 25, the operations of Perrault Farms kick into high gear.Ā
For the next 35 days, the Toppenish, Wash., facilities operate around the clock to harvest, dry, bale and chill the hops that will be sold to commercial and craft brewers worldwide. Ā Ā
āItās a very perishable crop,ā says Steve Perrault, president of the fourth-generation family business. āHops are kind of like a wine grapeāwhen theyāre ready, theyāre ready, and we need to be very efficient at processing them.ā
Perrault commissioned new metal buildings to replace the businessā previous cramped and outdated facilities. The buildings are designed to support maximum productivity during the cropās brief harvesting season. Ā Ā
A 19,530 square-foot hop kiln building is the first stop for the green hop cones after they are stripped from the vines. In this building, propane furnaces blow hot air on the cones to remove excess moisture. The entire process takes about nine hours, 25 percent faster than at the previous facility. Ā Ā
āWeāve cut down our drying time, which has also reduced our propane use and electricity substantially, so itās a much more sustainable facility,ā Perrault says.Ā
After drying, the cones are transported via conveyor to the adjacent 26,000 square-foot hop baling building, where they begin to cool. Ambient air blows through vented air trenches within the concrete floor slab, reducing cone temperature while eliminating the risk of spontaneous combustion.Ā
Ā
Ā
A four-foot cupola extending the full length of the building allows the moist, hot air to escape out of the roof.Ā
Next, the hop cones are compressed into 200-pound bales, stacked and transported by conveyor to the buildingās refrigerated cold room where the temperature is reduced to 28 degrees Fahrenheit.
A second-story office area and conference room at the center of the building overlooks the baling operations, providing a powerful sales tool. The facility also includes a laboratory used in the businessā hop-breeding program as well as an onsite pilot brewery where new varieties of hops can be tested.Ā
The exteriors of both buildings feature metal panels, reinforced concrete tilt-up panels with exposed aggregate finish, and a standing seam metal roof. Ā
āThe panels around the buildings contribute to the architectural design and also protect the structures from damage from forklifts and tractors as they maneuver around the site,ā says Steve Young, general manager of Concord Construction, the Star builder in Wapato, Wash., that oversaw construction. āThe concrete also adds structural strength to the hop baling building when the hops are cooling.āĀ
Extensive use of metal liner wall panels contributes to the structureās interior aesthetics, and the interior space also features hot dipped galvanized structural steel on all frames, columns and rafters so they wonāt be susceptible to rusting from the excess moisture in the air.Ā
The project also includes a 7,500 square-foot equipment cover building.Ā
Because the new facilities process significantly more hops than the previous ones, Perrault Farms has been able to increase the acreage of crops it plants by more than 30 percent.Ā
The new buildings also accommodate the stricter food safety guidelines required by craft brewers, which typically use fresh hops in their brewing process.
āWith the craft brewing industry growing so rapidly, food safety is very important to all of us,ā Perrault says.
The new complex has definitely impressed other hop farmers in the Yakima Valley, the largest hops-producing region in the U.S.Ā
āEverybody who has gone through the buildings is amazed; itās one of the top facilities in the industry right now,ā Perrault says. āThis is something I had to do for the next generations coming up.āĀ
Project construction was completed in 10 months.
āBy going with metal buildings from Star Buildings, it really decreases the construction time, which also makes it more cost-effective,ā Young says.
Related Stories
Cultural Facilities | Feb 20, 2015
āFloatingā park on New Yorkās Hudson River moves one step closer to reality
The developers envision the 2.4-acre space as a major performance arts venue.
Multifamily Housing | Feb 19, 2015
Is multifamily construction getting too frothy for demand?
Contractors are pushing full speed ahead, but CoStar Group thinks a slowdown might be in order this year.
Architects | Feb 19, 2015
Illustrator Federico Babina imagines architecture from nowhere
The illustrator imagines architecture where past, present, and future intertwine.
Codes and Standards | Feb 18, 2015
USGBC concerned about developers using LEED registration in marketing
LEED administrators are concerned about a small group of developers or project owners who tout their projects as āLEED pre-certifiedā and then fail to follow through with certification.
Multifamily Housing | Feb 18, 2015
Make It Right unveils six designs for affordable housing complex
BNIM is among the six firms involved in the project.
Office Buildings | Feb 18, 2015
Commercial real estate developers optimistic, but concerned about taxes, jobs outlook
The outlook for the commercial real estate industry remains strong despite growing concerns over sluggish job creation and higher taxes, according to a new survey of commercial real estate professionals by NAIOP.
Museums | Feb 18, 2015
Foster + Partners' National Museum of Marine Science and Technology breaks ground in Taiwan
The museum will be home to an aquarium, exhibition space, and waterfront views.Ā
University Buildings | Feb 18, 2015
Preparing for the worst: Campus security since Virginia Tech
Seven years after the mass shootings at Virginia Tech, colleges and universities continue to shake up their emergency communications and response capabilities to shootings and other criminal threats.
Office Buildings | Feb 18, 2015
Why the mobile workplace isn't always mobile
Perkins+Willās Janice Barnes addresses the nuance in mobility types and explains the importance of defining terms upfront.
University Buildings | Feb 17, 2015
BD+C exclusive: How security is influencing campus design and construction
Campus crimeāwhether real or perceivedāpresents Building Teams with more opportunities for early-stage consultation with university clients.Ā