flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Living/Learning Residence Hall breaks ground at Augustana University

University Buildings

Living/Learning Residence Hall breaks ground at Augustana University

KWK Architects designed the project.


By David Malone, Associate Editor | June 8, 2021
Augustana University Residence Hall exterior rendering

Courtesy KWK Architects

Augustana University officials have broken ground on a $50 million housing plan, which includes a construction of a new residence hall, on school's the Sioux Falls campus.

The L-shaped, three-story hall will house up to 200 students and include semi-suites with four beds and a bathroom in each unit. A community building at the front of the hall will include shared multi-purpose spaces and incorporate living and learning environments for faculty, students, and affinity groups on campus.

“We designed the new hall to be multi-functional for the entire campus community, and not just for the students living there,” said KWK Principal Paul Wuennenberg in a release. “Our design incorporates flexible classroom space that can be used for programming during the day, then utilized for community interactions in the evenings and weekends. A kitchen and lounge area in the hall further promotes community.”

The residence hall will be located on the south end of the university’s north campus near 33rd Street and Grange Avenue. KWK Architects is the lead designer for the new hall with TSP Inc. providing local architecture support, mechanical/electrical/structural engineering, and construction-phase services. Mortenson Construction is the developer/general contractor for the project, which is slated for completion in the fall of 2022.

Related Stories

University Buildings | Oct 25, 2016

Columbia University dedicates its new campus with great fanfare

Transparency to the surrounding community played a big role in the campus’s design.

School Construction | Oct 23, 2016

As construction rebounds, education sector spending flattens

Post-recession slump suggests a settling in at a “normal” level similar to the mid aughts.

University Buildings | Oct 19, 2016

UC Merced to nearly double its size by 2020

Its growth strategy includes adding 1.2 million sf of space for teaching, housing, and research. 

University Buildings | Oct 12, 2016

The new Hancher Auditorium opens on University of Iowa campus

The building replaces the previous Hancher, which was irreparably damaged in the 2008 flood.

University Buildings | Oct 11, 2016

The University of Iowa gets a new Visual Arts Building

The building was a collaborative effort between BNIM and Steven Holl Architects and marks the sixth facility the two firms have worked together on

Sponsored | University Buildings | Oct 3, 2016

Enhancing university life: The smart shower bead

Residential spaces that need to meet high traffic demands while accommodating an ever-changing populace creates a unique set of obstacles for any educational institution’s housing.

Sponsored | University Buildings | Sep 29, 2016

UWM’s Kenwood Interdisciplinary Research Complex: The most distinctive building on campus

The largest building on campus, it was designed by Flad Architects to comply with LEED Gold Certification standards and to meet a wide range of current and future academic needs.

University Buildings | Sep 12, 2016

The University of Chicago’s newest residence halls are designed to be more like home

Abundant common spaces give students more chances to interact.

University Buildings | Aug 17, 2016

Supporting communities of motivated learners: reflections on SCUP-51

The two themes that were consistently woven into different topics were institutional transformation and connection with students.

University Buildings | Aug 16, 2016

New images of Rice University’s Moody Center for the Arts revealed by Michael Maltzan Architecture

The arts center will foster creativity for making and presenting works across all disciplines

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021