flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

LEGO opens the first phase of its new Billund, Denmark campus

Office Buildings

LEGO opens the first phase of its new Billund, Denmark campus

C.F. Møller Architects designed the project.


By David Malone, Assocaite Editor | October 28, 2019
Large LEGO bricks incorporated into the building's facade

All images courtesy LEGO Group

All it takes is one glance at Billund, Denmark’s newest office campus to quickly identify which company will be taking residence there. Fully equipped with giant LEGO bricks on the roof and integrated into the facade, LEGO Group recently opened the first phase of its new campus, which, when completed, will span 581,250 sf and house 2,000 employees.

Designed by C.F. Møller Architects, the two buildings were inspired by a painting in Kjeld Kirk Kristiansen’s (the LEGO Group owner) office of a boy holding up a building he made with LEGO bricks. The goal of the design was to express LEGO Group’s core values of imagination, creativity, fun, learning, caring, and quality.

 

LEGO campus exterior

 

The interior space is highlighted by colorful textured walls resembling LEGO bricks and decorated with LEGO creations of familiar faces such as Spongebob Squarepants, Winnie the Pooh, and LEGO “minifigs” dressed as firefighters, police officers, etc. And while the spaces look like all fun and games, they were designed to help employees produce their best work.

 

See Also: Chicago’s long-gestating luxury condo tower nears construction

 

Figures made of LEGO in a gathering space in the new LEGO campus

 

In the same way you build with LEGO bricks, we took elements our people love and brought them all together to create something unique,” said Anneke Beerkens, Senior Workplace Anthropologist, LEGO Group, in a release. “For example, employees told us that they wanted the freedom to choose an environment that suited them best for whatever they were working on, but also liked to stay close to teammates. So we built team ‘neighbourhoods’ which are a mix of individual and collaborative workspaces designed to create a caring environment where people can do great quality work.”    

 

LEGO interior stairway

 

Sustainability was also a key tenet of the design. 4,150 solar panels cover the roof of a nearby parking garage and produce more than 1 million kWh, which will supply half of the energy needed to power the campus. Additionally, the new buildings’ rooftops are covered with Sedum plants, which absorb water and CO2, and rainwater will be used to irrigate parks in the campus area.

The full eight-building campus is slated for completion in 2021. A large central area, dubbed the “People House” will feature a large auditorium, fitness center, arts and crafts workshop, cafe, and accommodation for employees visiting from out of town.

 

Level three landing area in LEGO campus building

 

LEGO display area with LEGO minifigs

 

LEGO work space near a window

 

LEGO exterior

 

LEGO cafe area

 

LEGO spiral staircase

Related Stories

Building Team Awards | May 26, 2016

Cimpress office complex built during historically brutal Massachusetts winter

Lean construction techniques were used to build 275 Wyman Street during a winter that brought more than 100 inches of snow to suburban Boston.

Building Technology | May 24, 2016

Tech is the new office perk, says a new survey of American workers

But most employees still see their companies falling on the dull side of the cutting edge. 

High-rise Construction | May 17, 2016

Foster + Partners-designed towers approved as part of massive neighborhood redevelopment in San Francisco

One of Oceanwide Center’s buildings will be the city’s second tallest. 

Architects | May 16, 2016

3 strategies to creating environments that promote workplace engagement

VOA's Pablo Quintana writes that the industry is looking for ways to increase engagement through a mix of spaces suited to employees' desire for both privacy and connection.

Office Buildings | May 9, 2016

Can you make a new building as cool as a warehouse?

CannonDesign's Robert Benson insists that the industry needs to start looking at traditional office spaces differently.

Building Tech | Apr 13, 2016

The Hyperchair gives employees access to their own personal set of climate controls

Not only can the Hyperchair reduce heating and cooling costs and maximize employee comfort, but it can help a company become more environmentally friendly, as well.

Architects | Mar 20, 2016

Ars Gratia Artis: A North Carolina architect emphasizes the value of art in its designs

Turan Duda says clients are receptive, but the art must still be integral to the building’s overall vision.

Office Buildings | Mar 16, 2016

Google releases new plans and renderings of its Mountain View campus

The original canopy design scheme is still in place, but the plans now call for it to be opaque.

Office Buildings | Mar 10, 2016

Expedia unveils design for Seattle waterfront campus

Transparency and outdoor areas will give the complex a Pacific Northwest vibe.  

Office Buildings | Mar 9, 2016

CBRE: Workplace wellness on the rise

As insurance premiums and deductibles continue to rise, both employees and employers are evaluating options to improve their wellbeing, writes CBRE Healthcare Managing Director Craig Beam.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021