flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

LEED puts the 'Gold' in Riverside golden arches

LEED puts the 'Gold' in Riverside golden arches

McDonald's restaurant recognized for significant energy savings.


By By BD+C Staff | January 19, 2012
Two hundred-ninety four solar panels help power the McDonalds restaurant at 2242 University Avenue in Riverside, Calif. On Jan
This article first appeared in the March 2012 issue of BD+C.

A McDonald's restaurant in Riverside, Calif., was recently awarded LEED Gold certification, the first McDonald's west of the Mississippi, and only the fourth in the U.S., to receive the designation. 

"This gold certification from LEED underscores our rigorous sustainability initiatives," said Candace Spiel, McDonald's owner/operator. "

This restaurant is owned and operated by Tom and Candace Spiel and stood as a McDonald's for 44 years. In 2010, the restaurant was completely rebuilt and reopened on October 14, 2010 containing a host of green features such as low-flow plumbing fixtures, recycled denim insulation inside the building, native drought-tolerant plants to reduce water consumption by landscape and solar panels.

The restaurant also includes an interactive touch-screen display for visitors to learn about the building's features, environmental sustainability, and how individuals can reduce their carbon footprint.

The University Avenue McDonald's has achieved the following water and energy-savings.

  • The restaurant's solar array has generated electrical energy which saves approximately 8,950 kWH per month of utility usage, which is equal to the power usage of 13 average Riverside homes for one month. Increased efficiencies such as low-E glass windows and LED lighting helped realize an additional energy savings of 2,870 kWH per month, which is equal to an additional four Riverside homes.
  • Saved approximately 250,000 gallons of water, which is equal to the water of eight 20 ft x 40 ft swimming pools. 
  • Due to permeable pavers, about 283,000 gallons of rainfall water is diverted from storm water system per year, which is equal to the water of nine 20 ft x 40 ft swimming pools. 

"We are delighted that this local McDonald's has taken such significant measures to conserve our natural resources while educating residents about the importance of energy conservation," said Ron Loveridge, mayor of Riverside.

Beginning as manager trainee and crewperson, respectively, over the last 40 years Tom and Candace have risen within the ranks of the McDonald's system to own and operate nine McDonald's restaurants in the Inland Empire located in Chino, Ontario, Montclair, Pomona, Riverside and Rubidoux. Both Tom and Candace are members of the McDonald's Operators' Association of Southern California, which is comprised of more than 120 small business owners who operate more than 600 McDonald's restaurants in the counties of Los Angeles, Orange, Riverside, San Bernardino, and Ventura. BD+C 

Related Stories

| Nov 5, 2013

Oakland University’s Human Health Building first LEED Platinum university building in Michigan [slideshow]

Built on the former site of a parking lot and an untended natural wetland, the 160,260-sf, five-story, terra cotta-clad building features some of the industry’s most innovative, energy-efficient building systems and advanced sustainable design features.

| Nov 4, 2013

Architecture and engineering industry outlook remains positive on all major indicators

While still below pre-recession levels, all of the key indicators in the latest Quarterly Market Forecast (QMF) report from PSMJ Resources remain in positive territory.  

| Nov 1, 2013

CBRE Group enhances healthcare platform with acquisition of KLMK Group

CBRE Group, Inc. (NYSE:CBG) today announced that it has acquired KLMK Group, a leading provider of facility consulting, project advisory and facility activation solutions to the healthcare industry. 

| Oct 31, 2013

74 years later, Frank Lloyd Wright structure built at Florida Southern College

The Lakeland, Fla., college adds to its collection of FLW buildings with the completion of the Usonian house, designed by the famed architect in 1939, but never built—until now. 

| Oct 31, 2013

CBRE's bold experiment: 200-person office with no assigned desks [slideshow]

In an effort to reduce rent costs, real estate brokerage firm CBRE created its first completely "untethered" office in Los Angeles, where assigned desks and offices are replaced with flexible workspaces. 

| Oct 30, 2013

15 stellar historic preservation, adaptive reuse, and renovation projects

The winners of the 2013 Reconstruction Awards showcase the best work of distinguished Building Teams, encompassing historic preservation, adaptive reuse, and renovations and additions.

| Oct 30, 2013

11 hot BIM/VDC topics for 2013

If you like to geek out on building information modeling and virtual design and construction, you should enjoy this overview of the top BIM/VDC topics.

| Oct 29, 2013

Increased backlogs, margins lead to renewed optimism in global construction

After prolonged economic uncertainty, a majority of executives in the global engineering and construction sector have fresh confidence in the growth prospects for the industry, according to KPMG International's 2013 Global Construction Survey. A general increase in backlogs and margins is giving cause for optimism across the industry, with further growth anticipated.

| Oct 29, 2013

BIG opens subterranean Danish National Maritime Museum [slideshow]

BIG (Bjarke Ingels Group) has completed the Danish National Maritime Museum in Helsingør. By marrying the crucial historic elements with an innovative concept of galleries and way-finding, BIG’s renovation scheme reflects Denmark's historical and contemporary role as one of the world's leading maritime nations.

| Oct 28, 2013

Urban growth doesn’t have to destroy nature—it can work with it

Our collective desire to live in cities has never been stronger. According to the World Health Organization, 60% of the world’s population will live in a city by 2030. As urban populations swell, what people demand from their cities is evolving.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021