flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Lean, tech, talent training highlight contractor innovations

Contractors

Lean, tech, talent training highlight contractor innovations

From 5D estimating tools to interactive punch lists, the nation’s largest construction and construction management firms continue to push technology to gain an edge.


By David Barista, Editorial Director | September 5, 2018

HITT Contracting’s Co|Lab facility, set to open next summer, will be dedicated to testing products and ideas that will have a direct impact on the building industry. Designed by William McDonough + Partners, the cross-laminated timber (CLT) structure will serve as an exhibit, telling the story of mass timber buildings, living walls, and HITT’s application of VDC methodology and tools on the project. Courtesy HITT Contracting.

The latest developments at construction and construction management firms in 2017-18:

Bernards introduced market segment experts to lead the pursuit, management, and construction of all projects through “centers of excellence.” This has allowed a stronger focus on the pursuit process, which has resulted in a better “hit” rate on prospective projects.

Clark Group’s R&D team created Turnover Vision, an interactive punch list dashboard that provides real-time analysis of unit turnover status. The tool analyzes data from the project punch list and organizes it into interactive heat maps and graphs. “This Clark-developed solution enables our employees to spend more time communicating with clients and trade partners, completing punch list items and turning over units, rather than managing documents and printing reports,” according to the firm.

Cortland Partners outfitted a 60-foot-long trailer with a custom-designed classroom, including 46 feet of hands-on learning space, nine specialty training stations, and a video room. This mobile training unit allows the multifamily builder/designer/developer to deliver hands-on training to its employees across 11 states.

 

See also: Top 130 Contractor Firms - 2018 Giants 300 rankings 
See also: Top 80 Construction Management Firms - 2018 Giants 300 rankings
 

 

Project management firm Cumming launched two services: project controls and energy and sustainability. Its energy and sustainability team provides upfront auditing of its clients’ mechanical and electrical systems to ensure optimal efficiency. The project controls team uses automated reports and dashboards that illuminate key project metrics, which ultimately provide improved transparency on projects.

Fortis Construction is the only contractor in Oregon implementing the ConXtech Structural System, a chassis-based modular building system. For Kaiser Permanente’s new 90,000-sf Beaverton Medical Office Building, this solution provided early pricing guarantees during schematic design and day-one BIM model integration with improved accuracy of structural details. Fortis erected the entire structural system in just 12 days.

Gilbane is utilizing Triax Technologies’ Spot-R wearable, wireless communication devices to streamline project management. Spot-R tracks where work is happening, capturing time and attendance in real time. Heavy equipment can be tagged to ensure safety and operation by a certified worker.   

Haselden Construction developed a process that adds QR codes on equipment and door frames on projects, resulting in expedited issue resolution during punch list and the ability for the owner to proactively schedule maintenance upon construction completion. During punch list, once an issue is recorded, it coordinates all identified issues to everyone’s iPads, making tasks assignable and shareable.

HITT Contracting broke ground on Co|Lab, a space dedicated to testing products and ideas that will have a direct impact on the building industry. Designed by William McDonough + Partners, the cross-laminated timber (CLT) structure will serve as an exhibit, telling the story of mass timber buildings, living walls, and HITT’s application of VDC methodology and tools on the project. The contractor is looking to crowdsource ideas from existing design and construction partners, industry peers, and the public. Anticipated opening: summer 2019.

James G. Davis Construction is utilizing the last planner system (LPS) on a growing number of projects. LPS implements a series of scheduling and programming tactics, such as pull planning, to create and maintain buy-in at all levels at every stage in the construction process.

Kinsley Construction implemented 5D estimating software that allows estimators to visualize the project and confirm quantity takeoffs for any 3D model. The firm also uses 3D conceptual modeling/estimating software that creates detailed “rough order of magnitude” estimates by assigning costs to the 3D geometry. It allows teams to perform cost analysis and explore site selection, development concepts, and building layout in a single meeting.

Linbeck Group applies Lean principles to all work processes. Within the past 18 months, its War On Waste (WOW) program has published more than 50 videos demonstrating how its teams eliminate waste through process changes.      

Messer Construction has made steps to improve its safety performance through Lean daily management. Based on the collection and analysis of jobsite metrics, the firm created an action plan for the use of gloves on the jobsite. It required all Messer sites to implement 100% gloves at all times, starting October 2017. Hand injuries have dropped by 69% since then.

Two years after its launch, PCL Construction Enterprises’ PartsLab—a free Autodesk Revit addition that streamlines the management of design data for GCs—has been downloaded 1,500 times and has more than 370 registered users.

Pepper Construction Group has increased its investment in virtual and augmented reality workflows, leveraging the technology in the field. The impacts have been immediate and impressive. For instance, when used early on projects, AR/VR has replaced physical mock-ups, resulting in savings of $100,000 or more on a single project and reducing the overall project costs by driving earlier informed decisions.

Robins & Morton is executing its largest offsite/prefab project to date. For the new $255 million Shawn Jenkins Children’s Hospital at the Medical University of South Carolina, in Charleston, the firm built a 80,000-sf prefabrication warehouse, where all project trades are working together in a controlled environment to provide just-in-time materials delivery.

Rogers-O’Brien Construction has integrated collaborative project planning (CPP) into its preconstruction services. The goal of CPP is to proactively impact project costs and schedule by reducing the number of potential RFIs required to clarify design intent. It focuses on engaging with the design team, its consultants, and the owner immediately and intensely after the firm’s selection.

S.M. Wilson created a two-year leadership program to serve as a development tool for succession planning and retention, and to provide greater interaction and access to the current executive team. The firm also revised its onboarding process for new employees to include one year of mentoring, training, rotation through preconstruction and estimating, and field experience.

Skanska is exploring the integration of estimating, modeling, and virtual reality. Using a custom Revit Takeoff Template, the firm extracts material quantities using 3D models and then loads the model and cost information into VR (via the HTC Vive) to create immersive, first-person experiences for customers. By connecting design and material options with cost in VR, Skanska can enhance stakeholder understanding and improve real-time decision-making.

Skender published a report, “101 Ways to Build Smarter,” which provides insights from more than six decades of construction work. Among the 101 ideas:

• Lock in pricing: In an inflationary environment, lock in materials and equipment costs as soon as possible. As prices escalate, it often pays off to pre-purchase materials to avoid price hikes.

• Build lighter and smarter: Sometimes owners ask for materials and equipment that are larger or more powerful than the anticipated use requires.

• Go Lean: Focus on reducing wasted materials, time, and labor costs.

Among Turner Construction’s wide range of VR/AR applications, the firm created a safety education tool that uses a VR environment to provide immersive training for staff members and partners.

W.M. Jordan Company transformed its Project Executive leadership program to focus on Millennial development. It incorporated leadership programs from Harvard University, Wharton School at the University of Pennsylvania, and Stanford University.

Wight & Co. uses a proprietary approach, called SPARK Sessions, to help clients accelerate the design and development of their projects. This interdisciplinary, collaborative process engages teams, as well as the appropriate expertise within Wight & Co., during the earliest stages of a project.

Related Stories

| Nov 23, 2010

The George W. Bush Presidential Center, which will house the former president’s library

The George W. Bush Presidential Center, which will house the former president’s library and museum, plus the Bush Institute, is aiming for LEED Platinum. The 226,565-sf center, located at Southern Methodist University, in Dallas, was designed by architect Robert A.M. Stern and landscape architect Michael Van Valkenburgh.

| Nov 23, 2010

Honeywell's School Energy and Environment Survey: 68% of districts delayed or eliminated improvements because of economy

Results of Honeywell's second annual “School Energy and Environment Survey” reveal that almost 90% of school leaders see a direct link between the quality and performance of school facilities, and student achievement. However, districts face several obstacles when it comes to keeping their buildings up to date and well maintained. For example, 68% of school districts have either delayed or eliminated building improvements in response to the economic downturn.

| Nov 16, 2010

Brazil Olympics spurring green construction

Brazil's green building industry will expand in the coming years, spurred by construction of low-impact venues being built for the 2016 Olympics. The International Olympic Committee requires arenas built for the 2016 games in Rio de Janeiro meet international standards for low-carbon emissions and energy efficiency. This has boosted local interest in developing real estate with lower environmental impact than existing buildings. The timing couldn’t be better: the Brazilian government is just beginning its long-term infrastructure expansion program.

| Nov 16, 2010

Green building market grows 50% in two years; Green Outlook 2011 report

The U.S. green building market is up 50% from 2008 to 2010—from $42 billion to $55 billion-$71 billion, according to McGraw-Hill Construction's Green Outlook 2011: Green Trends Driving Growth report. Today, a third of all new nonresidential construction is green; in five years, nonresidential green building activity is expected to triple, representing $120 billion to $145 billion in new construction.

| Nov 16, 2010

Calculating office building performance? Yep, there’s an app for that

123 Zero build is a free tool for calculating the performance of a market-ready carbon-neutral office building design. The app estimates the discounted payback for constructing a zero emissions office building in any U.S. location, including the investment needed for photovoltaics to offset annual carbon emissions, payback calculations, estimated first costs for a highly energy efficient building, photovoltaic costs, discount rates, and user-specified fuel escalation rates.

| Nov 16, 2010

CityCenter’s new Harmon Hotel targeted for demolition

MGM Resorts officials want to demolish the unopened 27-story Harmon Hotel—one of the main components of its brand new $8.5 billion CityCenter development in Las Vegas. In 2008, inspectors found structural work on the Harmon didn’t match building plans submitted to the county, with construction issues focused on improperly placed steel reinforcing bar. In January 2009, MGM scrapped the building’s 200 condo units on the upper floors and stopped the tower at 27 stories, focusing on the Harmon having just 400 hotel rooms. With the Lord Norman Foster-designed building mired in litigation, construction has since been halted on the interior, and the blue-glass tower is essentially a 27-story empty shell.

| Nov 16, 2010

Where can your firm beat the recession? Try any of these 10 places

Wondering where condos and rental apartments will be needed? Where companies are looking to rent office space? Where people will need hotel rooms, retail stores, and restaurants? Newsweek compiled a list of the 10 American cities best situated for economic recovery. The cities fall into three basic groups: Texas, the New Silicon Valleys, and the Heartland Honeys. Welcome to the recovery.

| Nov 16, 2010

Landscape architecture challenges Andrés Duany’s Congress for New Urbanism

Andrés Duany, founder of the Congress for the New Urbanism, adopted the ideas, vision,  and values of the early 20th Century landscape architects/planners John Nolen and Frederick Law Olmsted, Jr., to launch a movement that led to more than 300 new towns, regional plans, and community revitalization project commissions for his firm. However, now that there’s a societal buyer’s remorse about New Urbanism, Duany is coming up against a movement that sees landscape architecture—not architecture—as the design medium more capable of organizing the city and enhancing the urban experience.

| Nov 16, 2010

NFRC approves technical procedures for attachment product ratings

The NFRC Board of Directors has approved technical procedures for the development of U-factor, solar heat gain coefficient (SHGC), and visible transmittance (VT) ratings for co-planar interior and exterior attachment products. The new procedures, approved by unanimous voice vote last week at NFRC’s Fall Membership Meeting in San Francisco, will add co-planar attachments such as blinds and shades to the group’s existing portfolio of windows, doors, skylights, curtain walls, and window film.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021