flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

At last, downtown Dallas tower to get $450 million redo

Multifamily Housing

At last, downtown Dallas tower to get $450 million redo

Landmark tower, vacant for a decade, will get a mix of apartments, hotel, restaurants, and retail.


By By Robert Cassidy, Editor, Multifamily Design+Construction | May 17, 2019

A crew from Andres Construction Services performs work on the adaptive reuse of First National Bank Tower, Dallas, into apartments, restaurants, retail, and the 200-room Texas flagship inn for Thompson Hotels. Photo: Andres Construction Services

After a decade of starts and stops, the 1.5 million-sf First National Bank Tower—which occupies the largest vacant block in the core of downtown Dallas—is to be redeveloped. Todd Interests is the new developer. Andres Construction Services is the GC. Merriman Anderson Architects is the design firm.

Work on the 52-story tower at 1401 Elm Street quietly began ramping back up in recent days, while the deal with Todd Interests was still being ironed out. That’s because the project must hit a completion target of year-end 2020 to qualify for millions in entitlements.

According to a May 8, 2019, report by Jeremiah Jensen in Commercial Real Estate, the redevelopment will focus on four uses: apartments, hotel, restaurants, and retail. A 200-room hotel, which will serve as a Texas flagship for Thompson Hotels, is scheduled to open in September 2020. The residential component will feature 318 luxury apartments, including some on the 48th floor—the highest in downtown Dallas.

The landmark tower has been vacant for a decade, according to a report by Steve Brown, RE Editor of the Dallas News. Todd Interests is the fifth owner to tackle redevelopment of the 1960s office tower, which is the largest empty building downtown.

Related Stories

| Aug 11, 2010

Giants 300 Multifamily Report

Multifamily housing starts dropped to 100,000 in April—the lowest level in several decades—due to still-worsening conditions in the apartment market. Nonetheless, the April total is below trend, so starts will move progressively back to a still-depressed 150,000-unit pace by late next year.

| Aug 11, 2010

The softer side of Sears

Built in 1928 as a shining Art Deco beacon for the upper Midwest, the Sears building in Minneapolis—with its 16-story central tower, department store, catalog center, and warehouse—served customers throughout the Twin Cities area for more than 65 years. But as nearby neighborhoods deteriorated and the catalog operation was shut down, by 1994 the once-grand structure was reduced to ...

| Aug 11, 2010

Gold Award: Westin Book Cadillac Hotel & Condominiums Detroit, Mich.

“From eyesore to icon.” That's how Reconstruction Awards judge K. Nam Shiu so concisely described the restoration effort that turned the decimated Book Cadillac Hotel into a modern hotel and condo development. The tallest hotel in the world when it opened in 1924, the 32-story Renaissance Revival structure was revered as a jewel in the then-bustling Motor City.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021