flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

At last, downtown Dallas tower to get $450 million redo

Multifamily Housing

At last, downtown Dallas tower to get $450 million redo

Landmark tower, vacant for a decade, will get a mix of apartments, hotel, restaurants, and retail.


By By Robert Cassidy, Editor, Multifamily Design+Construction | May 17, 2019

A crew from Andres Construction Services performs work on the adaptive reuse of First National Bank Tower, Dallas, into apartments, restaurants, retail, and the 200-room Texas flagship inn for Thompson Hotels. Photo: Andres Construction Services

After a decade of starts and stops, the 1.5 million-sf First National Bank Tower—which occupies the largest vacant block in the core of downtown Dallas—is to be redeveloped. Todd Interests is the new developer. Andres Construction Services is the GC. Merriman Anderson Architects is the design firm.

Work on the 52-story tower at 1401 Elm Street quietly began ramping back up in recent days, while the deal with Todd Interests was still being ironed out. That’s because the project must hit a completion target of year-end 2020 to qualify for millions in entitlements.

According to a May 8, 2019, report by Jeremiah Jensen in Commercial Real Estate, the redevelopment will focus on four uses: apartments, hotel, restaurants, and retail. A 200-room hotel, which will serve as a Texas flagship for Thompson Hotels, is scheduled to open in September 2020. The residential component will feature 318 luxury apartments, including some on the 48th floor—the highest in downtown Dallas.

The landmark tower has been vacant for a decade, according to a report by Steve Brown, RE Editor of the Dallas News. Todd Interests is the fifth owner to tackle redevelopment of the 1960s office tower, which is the largest empty building downtown.

Related Stories

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 13, 2010

Apartment complex will offer affordable green housing

Urban Housing Communities, KTGY Group, and the City of Big Bear Lake (Calif.) Improvement Agency are collaborating on The Crossings at Big Bear Lake, the first apartment complex in the city to offer residents affordable, eco-friendly homes. KTGY designed 28 two-bedroom, two-story townhomes and 14 three-bedroom, single-story flats, averaging 1,100 sf each.

| Oct 13, 2010

Residences bring students, faculty together in the Middle East

A new residence complex is in design for United Arab Emirates University in Al Ain, UAE, near Abu Dhabi. Plans for the 120-acre mixed-use development include 710 clustered townhomes and apartments for students and faculty and common areas for community activities.

| Oct 13, 2010

Community center under way in NYC seeks LEED Platinum

A curving, 550-foot-long glass arcade dubbed the “Wall of Light” is the standout architectural and sustainable feature of the Battery Park City Community Center, a 60,000-sf complex located in a two-tower residential Lower Manhattan complex. Hanrahan Meyers Architects designed the glass arcade to act as a passive energy system, bringing natural light into all interior spaces.

| Oct 12, 2010

The Watch Factory, Waltham, Mass.

27th Annual Reconstruction Awards — Gold Award. When the Boston Watch Company opened its factory in 1854 on the banks of the Charles River in Waltham, Mass., the area was far enough away from the dust, dirt, and grime of Boston to safely assemble delicate watch parts.

| Sep 13, 2010

Richmond living/learning complex targets LEED Silver

The 162,000-sf living/learning complex includes a residence hall with 122 units for 459 students with a study center on the ground level and communal and study spaces on each of the residential levels. The project is targeting LEED Silver.

| Sep 13, 2010

Committed to the Core

How a forward-looking city government, a growth-minded university, a developer with vision, and a determined Building Team are breathing life into downtown Phoenix.

| Aug 11, 2010

Brown Craig Turner opens senior living studio

Baltimore-based architecture and design firm Brown Craig Turner has significantly expanded its housing design capabilities and expertise with the launch of its new senior living studio.

| Aug 11, 2010

CTBUH changes height criteria; Burj Dubai height increases, others decrease

The Council on Tall Buildings and Urban Habitat (CTBUH)—the international body that arbitrates on tall building height and determines the title of “The World’s Tallest Building”—has announced a change to its height criteria, as a reflection of recent developments with several super-tall buildings.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021