flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

L.A.’s expedited permitting process credited with faster approvals on $1 billion project

Codes and Standards

L.A.’s expedited permitting process credited with faster approvals on $1 billion project

Parallel Design-Permitting Process includes flagging elements for correction during conceptual design.


By Peter Fabris, Contributing Editor | January 14, 2020

Courtesy Pixabay

The completion of the $1 billion Metropolis development in downtown Los Angeles was aided by the city’s streamlined permitting process, according to the developer.

With the recent completion of the 56-story, 650-unit condominium tower Thea, the development provides 1,500 residences, 350 hotel rooms, and 70,000 sf of retail space. The 6.3-acre Metropolis project broke ground in 2014. Two residential towers, one in 2017 and one in 2018, as well as the Hotel Indigo, are already open.

The developer, Greenland USA, says Los Angeles Department of Buildings and Safety’s Parallel Design-Permitting Process helped it complete the project efficiently and on time. The program allows plan inspectors to check and identify elements that need correction during the conceptual design phase.

Among the benefits to the program:

· Reduces design revisions

· Earlier approvals from other agencies

· Reduced permit processing time

· Earlier starts for contractors   

· Cost savings from a shorter construction timeline

Related Stories

Codes and Standards | Jan 2, 2020

CRE professionals have increased interest in embodied carbon accounting, smart buildings

Survey also shows that interest in resiliency lags behind.

Codes and Standards | Jan 2, 2020

White paper focuses on Metal Composite Material labeling

Document part of effort to uphold industry standards for the product.

Codes and Standards | Dec 18, 2019

Hard Rock Hotel collapse in New Orleans puts spotlight on undocumented workers

Having helped rebuild the city after Hurricane Katrina, many under threat of deportation.

Codes and Standards | Dec 18, 2019

Maryland lawmakers take on blocked sidewalks during construction projects

Legislation clarifies developers’ responsibilities.

Codes and Standards | Dec 18, 2019

New York City passes legislation to prevent bird strikes on buildings

Requires bird-safe materials on first 75 feet of a structure.

Codes and Standards | Dec 16, 2019

New Buildings Institute seeks entries for Zero Buildings Database

Listing illustrates feasibility of ultra low-energy buildings.

Codes and Standards | Dec 13, 2019

USGBC launches new tool to prioritize sustainability strategies

Highlights building design features that can lead to better performance.

Codes and Standards | Dec 12, 2019

Coalition calls for consistent building data disclosure regulations in Canada

Major real estate firms are driving the effort.

Codes and Standards | Dec 10, 2019

Utilities rolling out more grid-interactive efficient building programs

Focus is on energy savings and demand flexibility.

Codes and Standards | Dec 9, 2019

Canada’s Zero Carbon Building Standard reports first 10 certifications

Projects include new and existing offices, schools, and warehouses.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021