flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

L.A.’s expedited permitting process credited with faster approvals on $1 billion project

Codes and Standards

L.A.’s expedited permitting process credited with faster approvals on $1 billion project

Parallel Design-Permitting Process includes flagging elements for correction during conceptual design.


By Peter Fabris, Contributing Editor | January 14, 2020

Courtesy Pixabay

The completion of the $1 billion Metropolis development in downtown Los Angeles was aided by the city’s streamlined permitting process, according to the developer.

With the recent completion of the 56-story, 650-unit condominium tower Thea, the development provides 1,500 residences, 350 hotel rooms, and 70,000 sf of retail space. The 6.3-acre Metropolis project broke ground in 2014. Two residential towers, one in 2017 and one in 2018, as well as the Hotel Indigo, are already open.

The developer, Greenland USA, says Los Angeles Department of Buildings and Safety’s Parallel Design-Permitting Process helped it complete the project efficiently and on time. The program allows plan inspectors to check and identify elements that need correction during the conceptual design phase.

Among the benefits to the program:

· Reduces design revisions

· Earlier approvals from other agencies

· Reduced permit processing time

· Earlier starts for contractors   

· Cost savings from a shorter construction timeline

Related Stories

| Jan 2, 2014

EPA move to assert oversight on small bodies of water among top regulatory battles for 2014

The EPA has started the process of declaring that it has the power to regulate streams, brooks, and small ponds.

| Jan 2, 2014

Paseo Verde in Philadelphia is nation’s first LEED Platinum neighborhood development

Paseo Verde, a mixed-use, mixed-income community hosted a ribbon cutting ceremony last month.

| Jan 2, 2014

Green infrastructure prominent in Akron, Ohio's sewer plans

City officials in Akron, Ohio want to prevent stormwater from entering its combined sewer system through the use of green infrastructure.

| Jan 2, 2014

OSHA to hold public meeting on proposed rule to improve tracking of workplace injuries

The Occupational Safety and Health Administration (OSHA) has scheduled a public meeting to allow interested parties to comment on the proposed rule to improve tracking of workplace injuries and illnesses.

| Jan 2, 2014

Measuring whole building energy use among big changes in LEED v4

A new prerequisite in LEED v4 calls for each project to measure whole building energy use, and then share that data with USGBC.

| Jan 1, 2014

San Francisco hosts Net Positive Energy + Water Conference

The Living Building Challenge’s Net Positive Energy + Water Conference will be held Feb. 4-5 in San Francisco.

| Dec 27, 2013

California’s new Title 24 energy code compliance date pushed back to July 1, 2014

Due to the stringency of the provisions in California’s new Title 24 energy codes, their implementation has been postponed until July 1, 2014 to allow jurisdictions and engineers to prepare for them.

| Dec 27, 2013

$1 billion 'city within a city' development approved by Coachella, Calif., city council

The mega development includes 7,800 homes, a retail center, office space, and nearly 350 acres of open space.

| Dec 26, 2013

OSHA may require companywide reporting of injuries and illnesses

The Occupational Safety and Health Administration is considering a change in policy that would require organizations to submit company-wide data on illnesses and injuries. 

| Dec 26, 2013

USGBC recognizes Ohio for achieving 100th LEED-certified public school

The U.S. Green Building Council (USGBC) has recognized the state of Ohio and the Ohio School Facilities Commission (OSFC) on the LEED certification of the 100th public school building in the state. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021