flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

L.A.’s expedited permitting process credited with faster approvals on $1 billion project

Codes and Standards

L.A.’s expedited permitting process credited with faster approvals on $1 billion project

Parallel Design-Permitting Process includes flagging elements for correction during conceptual design.


By Peter Fabris, Contributing Editor | January 14, 2020

Courtesy Pixabay

The completion of the $1 billion Metropolis development in downtown Los Angeles was aided by the city’s streamlined permitting process, according to the developer.

With the recent completion of the 56-story, 650-unit condominium tower Thea, the development provides 1,500 residences, 350 hotel rooms, and 70,000 sf of retail space. The 6.3-acre Metropolis project broke ground in 2014. Two residential towers, one in 2017 and one in 2018, as well as the Hotel Indigo, are already open.

The developer, Greenland USA, says Los Angeles Department of Buildings and Safety’s Parallel Design-Permitting Process helped it complete the project efficiently and on time. The program allows plan inspectors to check and identify elements that need correction during the conceptual design phase.

Among the benefits to the program:

· Reduces design revisions

· Earlier approvals from other agencies

· Reduced permit processing time

· Earlier starts for contractors   

· Cost savings from a shorter construction timeline

Related Stories

Codes and Standards | Mar 21, 2018

Cape Town, South Africa’s dire water supply crisis raises concerns in the U.S.

Los Angeles, Salt Lake City, and Miami among cities at risk for water shortages.

Codes and Standards | Mar 20, 2018

Report shows how LEED certification supports net zero energy

Whole-building energy simulation, ASHRAE compliance requirement are key factors.

Codes and Standards | Mar 15, 2018

Energy efficiency measures contributing to flat demand for power

Utilities having difficulty adjusting to new business environment.

Codes and Standards | Mar 14, 2018

New parking lighting technology is paying off, Energy Dept. says

Newer products can cut energy costs by as much as 70%.

Codes and Standards | Mar 13, 2018

OSHA delays enforcement of beryllium exposure rule

The Occupational Safety and Health Administration (OSHA) voted to delay new beryllium exposure rules until May 11.

Codes and Standards | Mar 12, 2018

L.A. mayor proposes mandatory seismic retrofits for steel buildings, daycare centers, private schools

Los Angeles Mayor Eric Garcetti has proposed a seismic retrofit requirement for vulnerable steel buildings built before the 1994 Northridge earthquake.

Codes and Standards | Mar 8, 2018

Net zero commercial building trend shows strong momentum

Almost 50% more zero energy commercial buildings under construction in 2017.

Codes and Standards | Mar 7, 2018

Dept. of Energy says 2016 ANSI/ASHRAE/IES Standard 90.1 would save 8.2% of energy costs

Favorable comparison to 2013 standard for commercial buildings.

Codes and Standards | Mar 6, 2018

Well Living Lab launches extensive study on how indoor environments affect people’s lives

Factors that impact health, performance, stress and resiliency, sleep, and comfort to be scrutinized.

Codes and Standards | Mar 5, 2018

New guide helps planners assess innovation districts

The document is designed to aid in targeting resources toward innovative and inclusive economic development based on an area’s unique strengths and challenges.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021