flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Largest Passive House office building in the U.S. will be built in Chicago’s West Loop

Sustainability

Largest Passive House office building in the U.S. will be built in Chicago’s West Loop

Solomon Cordwell Buenz is designing the building.


By David Malone, Associate Editor | June 13, 2018
310 N. Sandamon Aerial View

Developed by Mark Goodman & Associates, 310 N. Sangamon will be the largest Passive House office building in the U.S. The building will be located around the corner from Google’s new Midwest headquarters in Chicago’s West Loop.

A 12-story office building planned for 310 N. Sangamon in Chicago’s West Loop will become the largest office building in the U.S. to achieve Passive House certification (and only the second building overall) if plans recently unveiled by Mark Goodman & Associates, Inc. pan out. The building will offer 268,000 sf of office space and 7,800 sf of ground-floor retail.

 

See Also: New Arizona State University building will reach triple net-zero performance

 

The SCB-designed building will feature a dedicated ventilation system that will provide filtered, tempered, and 100% outdoor air to help keep employees more comfortable, alert, and productive. The interior spaces will use low VOC finishes and furniture to avoid out-gassing, which lowers air quality and presents both short- and long-term health effects.

 

The entrance at 310 N. Sangamon is pedestrian- and bike-friendlyThe entrance at 310 N. Sangamon is pedestrian- and bike-friendly to welcome both office tenants and visitors to its 268,000 square feet of office space and 7,800 square feet of ground-floor retail. Courtesy SCB.

 

Office space will be dedicated to floors three through 12, while the second floor will feature an indoor parking garage with space for 47 cars. A fitness room, outdoor terrace, and bike storage room will be available to tenants.

310 N. Sangamon still needs zoning approval, but if completed it is expected to use about 86% less heating energy and 46% less cooling energy that traditional buildings.

Related Stories

Building Team Awards | Jun 13, 2017

Secluded sanctuary: Alnoba leadership training center

Leadership training center becomes New England’s first Passive House building.

Wood | Jun 6, 2017

Shigeru Ban-designed residential structure poised to become world’s tallest hybrid timber building

The wood, concrete, and glass building will rise approximately 233 feet when finished.

| May 30, 2017

Accelerate Live! talk: Health-generating buildings, Marcene Kinney, Angela Mazzi, GBBN Architects

Architects Marcene Kinney and Angela Mazzi share design hacks pinpointing specific aspects of the built environment that affect behavior, well-being, and performance.

Multifamily Housing | May 22, 2017

Zaha Hadid Architects residential development takes a page from a classic Bradbury tale

The buildings are on an elevated platform and the surrounding walkways are suspended so as not to disturb the surrounding ecosystems.

Sustainability | May 16, 2017

1.5 million recycled plastic bottles were used to build this nine-story structure in Taipei

The building is made of Polli-Brick, a building material that comes from 100% recycled Polyethylene Terephthalate Polymer.

Green | May 2, 2017

Green buildings don't have to cost more

What impact does sustainable design have on owners with a finite construction budget or developers who won’t own the building after construction?

Sustainability | Apr 20, 2017

The American Institute of Architects select the 2017 COTE Top Ten Awards

In its 21st year, the Top Ten Awards highlight projects that exemplify the integration of great design and great performance.

Sustainability | Apr 19, 2017

Embracing the WELL Building Standard: The next step in green

When you consider that 90% of our time is spent in buildings, how these environments can contribute to workplace productivity, health, and wellness is the logical next step in the smart building movement.

Sports and Recreational Facilities | Apr 19, 2017

Mercedes-Benz Stadium delayed until late August

The stadium is now scheduled to open on Aug. 26 in a preseason game between the Falcons and the Jaguars.

Multifamily Housing | Apr 18, 2017

Hanging Gardens-inspired CLT residential development proposed for Birmingham

Garden Hill will provide an ‘oasis-like residence’ for Birmingham’s growing, multicultural student population.

boombox1
boombox2
native1

More In Category




Government Buildings

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021