flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Largest Passive House office building in the U.S. will be built in Chicago’s West Loop

Sustainability

Largest Passive House office building in the U.S. will be built in Chicago’s West Loop

Solomon Cordwell Buenz is designing the building.


By David Malone, Associate Editor | June 13, 2018
310 N. Sandamon Aerial View

Developed by Mark Goodman & Associates, 310 N. Sangamon will be the largest Passive House office building in the U.S. The building will be located around the corner from Google’s new Midwest headquarters in Chicago’s West Loop.

A 12-story office building planned for 310 N. Sangamon in Chicago’s West Loop will become the largest office building in the U.S. to achieve Passive House certification (and only the second building overall) if plans recently unveiled by Mark Goodman & Associates, Inc. pan out. The building will offer 268,000 sf of office space and 7,800 sf of ground-floor retail.

 

See Also: New Arizona State University building will reach triple net-zero performance

 

The SCB-designed building will feature a dedicated ventilation system that will provide filtered, tempered, and 100% outdoor air to help keep employees more comfortable, alert, and productive. The interior spaces will use low VOC finishes and furniture to avoid out-gassing, which lowers air quality and presents both short- and long-term health effects.

 

The entrance at 310 N. Sangamon is pedestrian- and bike-friendlyThe entrance at 310 N. Sangamon is pedestrian- and bike-friendly to welcome both office tenants and visitors to its 268,000 square feet of office space and 7,800 square feet of ground-floor retail. Courtesy SCB.

 

Office space will be dedicated to floors three through 12, while the second floor will feature an indoor parking garage with space for 47 cars. A fitness room, outdoor terrace, and bike storage room will be available to tenants.

310 N. Sangamon still needs zoning approval, but if completed it is expected to use about 86% less heating energy and 46% less cooling energy that traditional buildings.

Related Stories

Adaptive Reuse | Mar 8, 2018

LEED Platinum for Memphis industrial reuse project

Memphis-based engineering firm OGCB and contractor Grinder Tabor Grinder led the removal of 54 million lb of concrete and 10 million lb of metal.

Hotel Facilities | Feb 12, 2018

Circular hotel will be world’s first energy positive hotel concept above the Arctic Circle

The hotel will provide 360-degree views of the Svartisen glacier and the surrounding arctic nature.

Wood | Feb 5, 2018

The largest timber office building in the U.S. will anchor Newark, N.J. mixed-use development

Michael Green Architecture is designing the building.

Green | Jan 31, 2018

U.S. Green Building Council releases annual top 10 states for LEED green building per capita

Massachusetts tops the list for the second year; New York, Hawaii and Illinois showcase leadership in geographically diverse locations.

Green | Jan 30, 2018

Welcome to the Jungle: Amazon’s Spheres have opened to employees and the public

The Spheres provide the most unique aspect of Amazon’s downtown Seattle headquarters.

Resiliency | Jan 17, 2018

Climate adaptation project addresses current and future climate changes in Randers, Denmark

The C.F. Møller-designed project is slated for completion in 2021.

Sustainability | Jan 16, 2018

The nation's capital of sustainable design

Major cities, like Washington, D.C., make up less than 2% of the world’s landmass, but they contribute 77% of the world’s CO2 emissions.

Museums | Jan 11, 2018

Suzhou Science & Technology Museum will highlight new cultural district in Shishan Park

The 600,000-sf museum will be about 62 miles northwest of Shanghai.

Urban Planning | Jan 10, 2018

Keys to the city: Urban planning and our climate future

Corporate interests large and small are already focused on what the impact of climate change means to their business.

boombox1
boombox2
native1

More In Category




Government Buildings

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021