flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

KU Jayhawks take a gander at a P3 development

University Buildings

KU Jayhawks take a gander at a P3 development

Kansas is in the RFP stage of its first P3 project, a new “gateway” housing facility that will be a key component of KU’s Central District Plan.


By Peter Fabris, Contributing Editor | May 19, 2015
KU Jayhawks take a gander at a P3 development

The west entrance of the main campus of the University of Kansas with the Chi Omega Fountain. Photo: Quasselkasper via Wikimedia Commons

This article first appeared in the May 2015 issue of BD+C.

The P3 (public–private partnership) concept is getting a tryout at the University of Kansas, where state funding for construction has fallen from 20% of project costs to about 11% over the last 10 years, according to James Modig, KU’s University Architect and Director of Design and Construction Management.

Despite those cutbacks, the university has $352 million worth of building projects in design or under construction this year, up from $100–150 million annually in recent years, says Modig.

Kansas is in the RFP stage of its first P3 project, a new “gateway” housing facility that will be a key component of KU’s Central District Plan, the centerpiece of its 2014–2024 Campus Master Plan.

In addition to providing capital funds, the owner will maintain the building during the projected 30-year lease. With a $300 million maintenance backlog and an annual maintenance budget of only $9.4 million, having a developer assume maintenance costs will be a welcome innovation, says Modig.

Learn more about P3 and other creative project financing strategies in BD+C's Special Report, “How your firm can help struggling colleges and universities meet their building project goals.”

Related Stories

University Buildings | Sep 7, 2021

Gateway to the West: Kansas City University Center for Medical Education Innovation

Kansas City University Center for Medical Education Innovation uses GKD Omega 1520 metal fabric.

Laboratories | Aug 31, 2021

Pandemic puts science and technology facilities at center stage

Expanding demand for labs and life science space is spurring new construction and improvements in existing buildings.

Giants 400 | Aug 30, 2021

2021 Giants 400 Report: Ranking the largest architecture, engineering, and construction firms in the U.S.

The 2021 Giants 400 Report includes more than 130 rankings across 25 building sectors and specialty categories.

Giants 400 | Aug 26, 2021

2021 University Giants: Top architecture, engineering, and construction firms in the higher education sector

Gensler, AECOM, Turner Construction, and CannonDesign head BD+C's rankings of the nation's largest university sector architecture, engineering, and construction firms, as reported in the 2021 Giants 400 Report.

University Buildings | Aug 19, 2021

School of Medicine completes on California University of Science and Medicine’s new Colton campus

The project was designed and built to address critical public health needs in an underserved region.

Resiliency | Aug 19, 2021

White paper outlines cost-effective flood protection approaches for building owners

A new white paper from Walter P Moore offers an in-depth review of the flood protection process and proven approaches.

University Buildings | Aug 12, 2021

Central Michigan University’s Chippewa Champions Center completes

The project was designed in partnership between Populous and GMB Architecture + Engineering.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021