flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

KPF unveils The Pinnacle at Central Wharf, a high-performance, resilient tower

Sustainability

KPF unveils The Pinnacle at Central Wharf, a high-performance, resilient tower

The project will reconnect Downtown Boston to the waterfront.


By David Malone, Associate Editor | February 12, 2020
The Pinnacle at Central Wharf

All renderings courtesy KPF

The Pinnacle at Central Wharf, a high performance and resilient mixed-use tower on the Boston harbor waterfront will reconnect Downtown Boston to the waterfront with new public space. 

The KPF-designed project will replace a seven-story parking garage that currently occupies the entirety of the site. The building will give half of the previously inaccessible area over to public open space and also incorporate innovative design strategies pertaining to climate resiliency, energy, emissions, water, and materials to minimize its environmental impact and improve the health and wellbeing of the community it serves.

 

The Pinnacle public realm

 

The tower’s curvilinear form will reduce shadow impacts and ease pedestrian flow around the building’s base, creating smooth circulation paths and opening view corridors to the water. As the tower rises, setbacks provide outdoor terraces for occupants and visitors, with views to Boston Harbor and downtown. The glass curtain wall is treated with a non-reflective coating to minimize the glare to the neighborhood.

 

See Also: HGA-designed hotel becomes one of the tallest buildings in Rochester, Minn.

 

The Pinnacle’s orientation on the site will enable a new pedestrian corridor, designed to integrate with the New England Aquarium’s proposed “Blueway” vision, to connect the waterfront to 28,000 square feet of on-site active public space, the Rose Kennedy Greenway, and Downtown Boston.

 

The Pinnacle top floors

 

The project will also be the first Downtown Waterfront project to implement Boston’s new climate conscious development mandates. The project site and the Harborwalk adjacent to the site will be elevated four feet above its present grade and connect with neighboring sites as they make similar adjustments in the future. These changes will help reduce inland flood risk, protect billions of dollars in property and infrastructure, and enhance walks along the harbor.

The Pinnacle is anticipating LEED Gold certification thanks to its high-performance envelope, high-efficiency mechanical and ventilation systems, and low-flow and low-consumption plumbing fixtures.

 

The Pinnacle exterior

Tags

Related Stories

Plumbing | Mar 13, 2020

Pioneer Industries launches new website

Pioneer Industries launches new website

Sustainability | Mar 12, 2020

Containing CO2 during construction

New tools make it easier to measure embodied carbon in materials before they get used for construction.

Sustainability | Mar 2, 2020

City of Buffalo to launch the largest environmental impact bond in the country

EIBs offer a novel approach to pay for high-impact projects based in part on the environmental, social, and/ or economic outcomes they generate.

Architects | Mar 2, 2020

Two ‘firsts’ for Sasaki and LEO A DALY

Following an industry trend, the firms hire chiefs of technology and sustainability, respectively.

Sustainability | Feb 26, 2020

Sustainability in a material world

The concepts of embodied carbon, zero waste, and deconstruction and reuse often run on parallel tracks.

Sustainability | Feb 6, 2020

Passive House picks up steam

Passive solutions that reduce a building’s energy consumption could get more viable as cities toughen CO2 emissions limits.

Contractors | Jan 20, 2020

Wellness is for builders, not just for buildings

New research on wellness in the construction sector highlights interventions that could be effective in addressing dehydration, weight management, poor air quality, and stress. 

Green | Jan 10, 2020

How the new EC3 tool raises the bar on collective action

Nearly 50 AEC industry organizations partnered to develop the groundbreaking Embodied Carbon in Construction Calculator.

Sustainability | Jan 2, 2020

Willis Tower becomes largest U.S. building to earn LEED Platinum

The tower earned the Platinum designation under LEED's latest v4.1 rating system.

75 Top Building Products | Dec 16, 2019

101 Top Products for 2019

Building Design+Construction readers and editors select their top building products for the past 12 months in the fourth-annual 101 Top Products report.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021