flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

KPF unveils design of Hong Kong University of Science and Technology campus

University Buildings

KPF unveils design of Hong Kong University of Science and Technology campus

The project will be built over two phases.


By David Malone, Associate Editor | April 1, 2021

All renderings courtesy KPF

Kohn Pedersen Fox (KPF) has recently unveiled the master plan of the Hong Kong University of Science and Technology (HKUST) campus. 

The project, located in Nansha, Guangzhou will span 11.6 million sf and accommodate more than 10,000 students and faculty. Space for housing, teaching and research, athletics, performing arts, and amenities, as well as a 24-hour library and state-of-the-art laboratories, will also be included. All of the spaces and facilities will converge around a dynamic central space meant to foster interdisciplinary collaboration and create a strong community.

 

HKUST exterior facilities

 

The design of the campus will combine HKUST’s programmatic aspirations with the site’s natural aesthetic, waterways, and urban context while targeting carbon neutrality and zero waste water. Three canals will embrace the delta and enforce the zero waste water goal, collecting and filtering rainwater for reuse and promoting resiliency through flooding and wetland protection. Within the canals’ borders, the campus will be free of emissions. A smart electric mobility network will support all transportation of resources and people.

The main outdoor collaboration areas and the buildings themselves will incorporate a combination of active and passive thermal comfort strategies to guarantee the well-being and enjoyment of occupants within the humid micro-climate of the site.

 

HKUST collaboration space

 

HKUST interior building space

 

HKUST green space

 

HKUST aerial

Related Stories

Sports and Recreational Facilities | Nov 27, 2017

The University of Memphis unveils the new home of the men’s basketball program

The Laurie-Walton Family Basketball Center will provide a strong commitment to donor and VIP cultivation.

Adaptive Reuse | Nov 10, 2017

Austin’s first indoor shopping mall becomes Austin Community College’s new digital media center

Renovation of the defunct mall represents Phase 2 of ACC’s $100 million adaptive reuse project.

University Buildings | Nov 6, 2017

A reconstructed building sets the standard for future rehabs at Cornell

Early AE collaboration played a major role in moving this project forward efficiently. 

University Buildings | Oct 13, 2017

The University of Oklahoma receives its first residential colleges

The residential communities were designed by KWK Architects and combine living and learning amenities.

University Buildings | Oct 12, 2017

USC to debut new bioscience center next month

The building is designed to maximize recruitment and interaction of scientists and researchers.

University Buildings | Oct 12, 2017

The Center for Wounded Veterans is a first for a university campus

The Chez Family Foundation Center for Wounded Veterans in Higher Education is the first building of its kind on a U.S. college campus.

University Buildings | Oct 10, 2017

A 1920s cheese factory is now a university science building

Almost 15,000 sf of space was added to the original, four-story building.

Sustainability | Oct 9, 2017

New Arizona State University building will reach triple net-zero performance

The science and research complex will include an atrium biome filled with plants and water.

Higher Education | Sep 18, 2017

Campus landscape planning of the future: A University of Wisconsin-Madison case study

Recognizing that the future health of the campus and lake are interdependent, this innovative approach will achieve significant improvements in stormwater management and water quality within the university’s restored, more connected network of historic and culturally rich landscapes.

University Buildings | Sep 15, 2017

New Blinn College Residence Hall hopes to decrease the size of the campus housing wait list

In 2016, more than 400 students were placed on the wait list due to lack of available on-campus housing.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021