flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

K-8 school will help students learn by conducting expeditions in their own communities

K-8 school will help students learn by conducting expeditions in their own communities

The Peck Expeditionary Learning School will feature flexible classrooms and decompression spaces. And instead of a cafeteria, the school will bring meals to students where they are.


By Novid Parsi, Contributing Editor | September 7, 2022
Peck Learning School Courtyard
Courtesy SHP.

In August, SHP, an architecture, design, and engineering firm, broke ground on the new Peck Expeditionary Learning School in Greensboro, N.C. 

Replacing the current Clara J. Peck Neighborhood K-5 Elementary, the Peck Expeditionary Learning School will be the district’s first building to adopt the K-8 model. Expeditionary Learning (EL) centers the curriculum around multidisciplinary learning expeditions that can take an entire semester for small or large groups to complete. Instead of revolving around classroom-based instruction, the learning expeditions encourage students to engage in interactive, iterative learning in their own communities.

The new school will house five learning communities that bring together similar grade levels, so students can collaborate with their own age groups. Each learning community will include spaces for student project displays, hands-on learning, and community engagement. Flexible classrooms will facilitate multiple instruction methods, while decompression spaces will help students cope with emotional challenges. Instead of a traditional cafeteria, a distributed dining system will bring meals to the students where they are.

“Following the feedback we heard from students, staff, and the community, we aimed to create a high-quality, student-focused environment capable of fostering an entire generation of lifelong learners,” David Powell, SHP architect and senior project manager, said in a statement.

In recent years, SHP has completed several other school projects designed for progressive pedagogies, such as the lower and upper school campuses at Winton Woods City Schools in Cincinnati, Ohio—one of the country’s first school district-wide redesigns to support Project-Based Learning (PBL).

On the Building Team:
Owner: Guilford County Schools
Design architect: SHP
Architect of record: SHP
MEP engineer: SAMR
Structural engineer: Lynch-Mykins
Construction manager at risk, joint venture: Christman/D.A. Everett

Related Stories

Education Facilities | Aug 20, 2018

More districts are reusing empty offices, stores, and other buildings to upgrade their schools

Older schools, with their small windows and rooms and creaky infrastructure, are tough and expensive to retrofit.

Education Facilities | Aug 14, 2018

Making schools more secure is imperative, but how best to do that isn't settled yet

In the first 21 weeks of 2018 alone, there were 23 school shootings where someone was killed or injured, according to CNN.

Education Facilities | Aug 13, 2018

Is STEM running out of steam?

Has STEM, which the business community urged school districts to embrace, been oversold as a career path?

Education Facilities | Aug 7, 2018

High-tech instruction space trains students in manufacturing robots

Harley Ellis Devereaux served as lead designer and lab planner for the project.

Education Facilities | Jul 11, 2018

Why school architects must understand how students learn

Would instruction be more effective if students spent less time passively listening to lectures and more time actively learning through activities, discussions, and group work? 

Education Facilities | Jul 6, 2018

Building for growth: Supporting gender-specific needs in middle school design

Today, efforts toward equity in education encompass a wide spectrum of considerations including sex, gender identity, socio-economic background, and ethnicity to name a few.

University Buildings | Jul 5, 2018

Brown University’s Engineering Research Center increases the university’s School of Engineering lab space by 30%

KieranTimberlake designed the facility and Shawmut Design and Construction was the general contractor.

boombox1
boombox2
native1

More In Category


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021