Located on a former World War II air base, Jaguar Land Rover’s Advanced Product Creation Centre includes 50,000-sm of new built space meant to accommodate 3,500 staff in Warwickshire, England. The project combines design, engineering, and production purchasing under one roof for the first time.
The building space features the Jaguar Design Studio, offices, a site-wide restaurant, a 400-seat multipurpose hall, and a visitor building. An internal street connects these amenities to existing buildings in an effort to foster community and maximize the potential for collaboration.
A supporting steel “super-grid” accommodates the wide range of spaces within an overall structural order and correlates with the triangular geometry of the original air base runways on the site. Additionally, Europe’s largest timber roof crowns the building. The timber roof expresses sustainability and includes rooflights that flood the interior with natural light.
See Also: New details released for Universal Studios Japan’s Super Nintendo World
The Advanced Product Creation Centre will focus on creating future autonomous, connected, electrified, and shared mobility technologies.
Related Stories
Office Buildings | Oct 23, 2019
Ferrara Candy Company gets new HQ space in Chicago’s Old Post Office building
NELSON Worldwide designed the project.
Office Buildings | Oct 23, 2019
London’s new ‘Can of Ham’ office building completes construction
Foggo Associates designed the building.
Office Buildings | Oct 21, 2019
IH Mississippi Valley Credit Union headquarters completes construction
LEO A Daly designed the building.
Office Buildings | Oct 17, 2019
New social campus for innovators, tech leaders covers a full city block
Hollwich Kushner, with Gensler as design development architects, designed the building.
Office Buildings | Oct 15, 2019
New 80,000-sf coworking space completes in Chicago
It is the third ‘Spaces’ location in Chicago.
Office Buildings | Oct 8, 2019
David Chipperfield Architects to design new Rolex USA headquarters
The project will replace the existing building that has been occupied by Rolex since the 1970s.
Healthcare Facilities | Oct 1, 2019
Medical offices are filling space vacated by retail
Healthcare developers and providers like the locations, traffic, and parking these spaces offer.
Office Buildings | Sep 25, 2019
'Catalyst' will be Washington’s first CLT office building
Katerra is the design builder for the project with Michael Green Architecture as the design architect.
Office Buildings | Sep 6, 2019
New office complex in Southern California strives to create a Silicon Valley-like campus vibe
FLIGHT at Tustin Legacy includes 100,000 sf of amenities, and is laid out to tie into the surrounding city.
Office Buildings | Sep 3, 2019
A new HOK report focuses on designing offices for a neurodiverse workforce
Emphasizing inclusion and choice is a key component.