flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Jaguar Land Rover’s Advanced Product Creation Centre has the largest timber roof in Europe

Office Buildings

Jaguar Land Rover’s Advanced Product Creation Centre has the largest timber roof in Europe

Bennetts Associates designed the project.


By David Malone, Associate Editor | January 16, 2020
Advanced Product Creation Centre exterior

All images courtesy Bennetts Associates

Located on a former World War II air base, Jaguar Land Rover’s Advanced Product Creation Centre includes 50,000-sm of new built space meant to accommodate 3,500 staff in Warwickshire, England. The project combines design, engineering, and production purchasing under one roof for the first time.

The building space features the Jaguar Design Studio, offices, a site-wide restaurant, a 400-seat multipurpose hall, and a visitor building. An internal street connects these amenities to existing buildings in an effort to foster community and maximize the potential for collaboration.

 

Jaguar Land Rover's Advanced Product Creation Centre

 

A supporting steel “super-grid” accommodates the wide range of spaces within an overall structural order and correlates with the triangular geometry of the original air base runways on the site. Additionally, Europe’s largest timber roof crowns the building. The timber roof expresses sustainability and includes rooflights that flood the interior with natural light. 

 

See Also: New details released for Universal Studios Japan’s Super Nintendo World

 

The Advanced Product Creation Centre will focus on creating future autonomous, connected, electrified, and shared mobility technologies.

 

Advanced Product Creation Centre interior

Related Stories

Smart Buildings | Nov 20, 2020

The Weekly show: SPIRE smart building rating system, and pickleball court design tips

The November 19 episode of BD+C's The Weekly is available for viewing on demand.

Office Buildings | Nov 17, 2020

Former elementary school becomes modern office space in North Charleston

The Middleton Group is designing the project.

Government Buildings | Nov 13, 2020

Tax shortfalls nip government projects in the bud

Federal contracts are proceeding, but states and cities are delaying, deferring, and looking for private investment.

AEC Tech | Nov 12, 2020

The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage

BD+C editors speak with experts from ALICE Technologies, Build Group, Hastings Architecture, Nvidia, and Woods Bagot on the November 12 episode of "The Weekly." The episode is available for viewing on demand.

Office Buildings | Nov 9, 2020

HWKN unveils Bushwick Generator office campus

The building will become a new hub for innovative companies in Brooklyn.

Building Team Awards | Nov 2, 2020

It's back to the future for this contractor

Poettker Construction’s new headquarters in rural Breese, Ill., is recognized with a Bronze Award in BD+C’s 2020 Building Team Awards.

Smart Buildings | Oct 26, 2020

World’s first smart building assessment and rating program released

The SPIRE Smart Building Program will help building owners and operators make better investment decisions, improve tenant satisfaction, and increase asset value.

Office Buildings | Oct 14, 2020

Chicago’s Bank of America Tower completes, opens

Goettsch Partners designed the project.

Office Buildings | Oct 8, 2020

New Florida office property is designed for a post-Covid-19 world

Chesterfield is developing the project.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021