flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Italian architect designs vertical forest with prefab units by BuroHappold

Mixed-Use

Italian architect designs vertical forest with prefab units by BuroHappold

The architect says the building design is an effort at sustainability, but one green architecture critic doesn’t buy it.


By Adilla Menayang, Assistant Digital Editor | November 16, 2015
Italian architect designs vertical forest with prefab units by BuroHappold

Cantilevered planters will host cedar trees and other plants hundreds of feet above ground. Renderings courtesy Stefano Boeri

Designs by Italian architect Stefano Boeri for a verdant mixed-use tower have been given the green light by officials in Lausanne, Switzerland, Gizmag reports.

Office spaces, luxury apartments, and a 53,819-sf retail center will comprise the 36-floor structure, which renderings depict as a tower stacked Jenga style with white rectangular units and patches of green trees and shrubbery strewn throughout.

Dubbed La Tour des Cedres (or Cedar Trees Tower), the architect says the green design will be boosted by other sustainable technology, such as solar power and rainwater collection. Among the plants will be 100 of the tower’s namesake plant, cedar trees, 6,000 shrubs, and 18,000 other plants, most of them native to the area. Together, the plants will make up more than 32,200 sf of greenery.

The cantilevered concrete planters and loggia are being engineered by BuroHappold “as prefabricated units that connect directly to the tower’s reinforced concrete frame,” Gizmag reports.

But green architecture writer and critic Lloyd Alter of TreeHugger argues that the amount of reinforced concrete needed to accomplish Boeri’s design may cancel out all the other conservation and sustainability endeavors of the building.

“Trees, and the soil they need to survive and grow, are heavy, and it takes a lot of reinforced concrete to support them on these cantilevered balconies. Concrete is responsible for 5 to 7 percent of the carbon dioxide we produce, so the responsible and sustainable thing is to use less of it,” Alter writes. “Without an analysis of how much concrete is needed to support these trees, [versus] how much CO2 the trees absorb, you can't call this sustainable design.”

According to DesignBoom, La Tour des Cedres is due to begin construction in 2017.

 

Tags

Related Stories

High-rise Construction | Apr 17, 2018

Developers reveal plans for 1,422-foot-tall skyscraper in Chicago

The tower would be the second tallest in the city.

Mixed-Use | Apr 4, 2018

Shenzhen’s Mawan Mile master plan will include a ‘boulevard in the sky’

HASSELL won a competition to design the new mixed-use district.

Multifamily Housing | Feb 22, 2018

Multifamily building with 25,000 sf of amenities rises on the shore of the Potomac River

The building is part of the National Gateway mixed-use development at Potomac yard.

Mixed-Use | Jan 26, 2018

Eager Park opens as health and wellness centerpiece of future mixed-use master plan

The 6-acre park was designed to showcase East Baltimore’s commitment to wellness and sustainability.

Sports and Recreational Facilities | Jan 25, 2018

Virginia Beach: A surf town with a wave problem no more

A world-class surf park will highlight Virginia Beach’s new live-work-play development.

Mixed-Use | Jan 16, 2018

Mixed-use development under construction in Detroit’s central business district

The development is being built on the former site of the Statler Hotel.

Mixed-Use | Jan 5, 2018

USC Village is the largest development in the history of the University of Southern California

USC Village comprises six buildings and 1.25 million sf.

Mixed-Use | Jan 3, 2018

A Houston luxury apartment complex has its own co-working space

The new community is located in the economic and population center of Houston.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021