The biopolymer component of InPro’s revolutionary G2 Blend formula has just become Cradle to Cradle CertifiedCM Silver from Cradle to Cradle Products Innovation Institute. McDonough Braungart Design Chemistry (MBDC) has licensed the certification mark along with the Cradle to Cradle protocols to the Institute, which is responsible for certifying products.
NatureWorks’ Ingeo biopolymer, made from plants, not oil, is the first product of its kind to become Cradle to Cradle Certified Silver. InPro combines Ingeo with Eastman Chemical’s PETG, which also holds a C2C Silver certificate. InPro’s formula also contains recycled content. All three components give G2 Blend significant impact resistance for its interior protection products.
“With G2 Blend, we wanted to completely revolutionize interior protection products, and we were the first to step beyond traditional polymers,” said Mark Alan, senior vice president of product management and development at InPro. “We had toyed with plain PETG for six years, but it didn’t live up to our performance expectations. We abandoned it because it was just too brittle, especially in field fabrication.
“By combining Ingeo, PETG and some recycled content, we arrived at a much-more-durable formula,” Alan said. He went on to say InPro’s G2 Blend biopolymer products continue to rack up impressive sales numbers. “We keep having to move the sales target for the biopolymer products because the market is buying well ahead of our projections. I’ll gladly do that math.”
Like NatureWorks and Eastman Chemical, InPro is staying in the lab, and pushing R&D to reach beyond past-generation plastics. “The market wants to know we’re doing our part to take material science to the next level, and then the one beyond that,” Alan said. “R&D can often take us out into unexplored territory, but that’s what innovation is all about.” +
Related Stories
| Oct 1, 2012
Tyco completes separation process, now largest pure-play fire protection and security business
Tyco Integrated Security focused on delivering security solutions to commercial businesses.
| Sep 28, 2012
Seattle is home to first LEED-certified modular radiation center
By using modular construction and strategic site design, RAD Medical Systems built the first radiation center to receive LEED certification.
| Sep 26, 2012
EDITORIAL OPPORTUNITY – BD+C Greenbuild 2012 Issue
Your firm is invited to contribute to this special issue, which will be distributed at Greenbuild San Francisco, Nov. 14-16, 2012.
| Sep 24, 2012
Reed Construction completes Lafarge headquarters in Chicago
Reed Construction was contracted to complete the full third floor build-out which included the construction of new open area work space, private offices, four conference rooms with videoconferencing capabilities and an executive conference boardroom.
| Sep 24, 2012
Chicago Lakeside shortlisted for the Sustainia Award
The “Lakeside Idea” is about bridging a brownfield industrial past to a green lifestyle future, from steel mill to innovation mill.
| Sep 24, 2012
$3.8-million athletic field and track opens in Glen Head, N.Y.
The complex also includes a new, one-story, multi-purpose building that serves as the main entry port to the athletic facilities.
| Sep 21, 2012
AAMA and WDMA release updated review and forecast that predicts industry trends
Significant volume is expected to return to the entry and interior door market as new construction demand is expected to grow at double-digit rates, outpacing remodeling and replacement activity as the housing market recovers.
| Sep 20, 2012
Mid-box retail study shows lack of available sites in Chicago
Existing supply is tight everywhere and almost non-existent in the most attractive zones.
| Sep 20, 2012
Forrester begins construction of freestanding cancer center in Montgomery County, Md.
The new 51,000-square-foot building will include two linear accelerator vaults for radiation equipment.
| Sep 19, 2012
Modular, LEED-Gold Certified Dormitory Accommodates Appalachian State University Growth
By using modular construction, the university was able to open a dorm a full year earlier than a similar dorm built at the same time with traditional construction.