The biopolymer component of InPro’s revolutionary G2 Blend formula has just become Cradle to Cradle CertifiedCM Silver from Cradle to Cradle Products Innovation Institute. McDonough Braungart Design Chemistry (MBDC) has licensed the certification mark along with the Cradle to Cradle protocols to the Institute, which is responsible for certifying products.
NatureWorks’ Ingeo biopolymer, made from plants, not oil, is the first product of its kind to become Cradle to Cradle Certified Silver. InPro combines Ingeo with Eastman Chemical’s PETG, which also holds a C2C Silver certificate. InPro’s formula also contains recycled content. All three components give G2 Blend significant impact resistance for its interior protection products.
“With G2 Blend, we wanted to completely revolutionize interior protection products, and we were the first to step beyond traditional polymers,” said Mark Alan, senior vice president of product management and development at InPro. “We had toyed with plain PETG for six years, but it didn’t live up to our performance expectations. We abandoned it because it was just too brittle, especially in field fabrication.
“By combining Ingeo, PETG and some recycled content, we arrived at a much-more-durable formula,” Alan said. He went on to say InPro’s G2 Blend biopolymer products continue to rack up impressive sales numbers. “We keep having to move the sales target for the biopolymer products because the market is buying well ahead of our projections. I’ll gladly do that math.”
Like NatureWorks and Eastman Chemical, InPro is staying in the lab, and pushing R&D to reach beyond past-generation plastics. “The market wants to know we’re doing our part to take material science to the next level, and then the one beyond that,” Alan said. “R&D can often take us out into unexplored territory, but that’s what innovation is all about.” +
Related Stories
| Oct 4, 2012
BD+C's 29th Annual Reconstruction Awards
Presenting 11 projects that represent the best efforts of distinguished Building Teams in historic preservation, adaptive reuse, and renovation and addition projects.
| Oct 4, 2012
Electronic power tool builds project transparency
As building projects have grown in scope and complexity, so, too, has the task of document management. A new online tool is helping Building Teams meet that demand.
| Oct 4, 2012
HMC Architects in service to the community
HMC employees give back to their communities through toy drives and fundraising efforts like CANstruction, which benefits local food banks.
| Oct 4, 2012
Career development, workplace environment programs key to retention at HMC Architects
Architecture firm take a multifaceted approach to professional development.
| Oct 4, 2012
Foundation tightens HMC Architects bond with local communities
Founded in 2009 with an initial endowment of $1.9 million, HMC’s nonprofit Designing Futures Foundation (DFF) has donated about $230,000 in its three years of existence, including $105,000 in scholarships to California students. The grants help promising high schoolers with an interest in architecture, design, engineering, education, or healthcare pay for expenses like test preparation services, computers, and college entrance exam fees and tuition. The scholarships can be extended for up to five years of college.
| Oct 4, 2012
Gilbane publishes Fall 2012 construction industry economic report
Report outlines fluctuation in construction spending; predicts continued movement toward recovery.
| Oct 3, 2012
Fifth public comment period now open for update to USGBC's LEED Green Building Program
LEED v4 drafts and the public comment tool are now available on the newly re-launched, re-envisioned USGBC.org website.
| Oct 2, 2012
Mirvish and Gehry unveil conceptual design to transform Toronto’s entertainment district
Reimagining of King Street Entertainment District supports Toronto’s cultural corridor.
| Oct 2, 2012
Dow Business Services Center building named 2012 “America’s Best Buildings of the Year” winner
Building constructed with air sealing and insulation products from Dow Building Solutions.
| Oct 2, 2012
Bernards working on project at L.A. White Memorial Medical Center
The new facility is a $15-million, 41,000-sf concrete structure which includes three stories of medical office space atop a three-level parking garage.