flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hoboken Terminal restoration complete

Hoboken Terminal restoration complete

Restoration of ferry slips, expanded service to benefit commuters.


By By BD+C Staff | December 21, 2011
The second phase also included marine construction of five of the original six ferry slips, as well as restoration of the exteri

New Jersey Department of Transportation Commissioner and NJ TRANSIT Board Chairman James Simpson and NJ TRANSIT Executive Director James Weinstein joined local, state and federal officials recently celebrated the completion of a project that returned a portion of Hoboken Terminal to its original design—restoring permanent ferry service to the historic building. 

The historic, Beaux-Arts style terminal and its ferry slips were originally built by the Delaware, Lackawanna and Western Railroad in 1907. Hoboken ferry service was discontinued in 1967 due to declining demand, but was reintroduced in 1989 at a temporary facility at the southern end of the terminal building. 

In early 2003, NJ TRANSIT and the Port Authority entered into an agreement to allow for the restoration of the Hoboken Terminal ferry slips and supporting infrastructure, with the goal of returning ferry service to its original location, while protecting and enhancing the historic elements of the terminal.

The $120 million project, funded through a mixture of state, federal and Port Authority funding, was divided into three phases. The first phase, which began in April 2004 and was completed in September 2005, included repairs to the terminal’s substructure and superstructure.

Work on the second phase began in December 2005 and was completed in April 2008, including construction of a 230-foot tall clock tower replica modeled after the original 1907 design by architect Kenneth Murchison. In homage to the original, the clock tower includes four-foot-high copper letters spelling out the word “Lackawanna” and is surmounted by an illuminated clock with four 12-foot diameter faces, one on each side of the tower. 

The second phase also included marine construction of five of the original six ferry slips, as well as restoration of the exterior copper facade and lighting on the river side of the terminal, structural repairs, roof repairs and demolition of the finger piers and wooden fenders.

Construction of the ferry boarding area was completed in the third and final phase, along with all remaining work necessary to restore ferry service to the original slips, including work on utilities, lighting, the ticketing area, ferry barges and gangways. 

NY Waterway, owned and operated by Port Imperial Ferry Corp and Billybey Ferry Co., will be providing service from the ferry slips. NY Waterway provides the largest privately-owned commuter ferry service in the U.S., carrying 35,000 passenger trips per day – 8 million trips per year, including service between New Jersey and Manhattan. 

Hoboken Terminal currently provides travelers multiple transit options including commuter rail, light rail, bus, PATH and ferry service. Nearly 60,000 people use the terminal on a typical weekday. BD+C

Related Stories

Green | Mar 29, 2017

Copenhagen Zoo and BIG unveil yin yang-shaped panda habitat

The new habitat will sit between two existing buildings, including the Elephant House designed by Norman Foster.

Architects | Mar 28, 2017

A restroom for everyone

Restroom access affects everyone: people with medical needs or disabilities, caretakers, transgender people, parents with children of the opposite gender, and really anyone with issues or needs around privacy.

High-rise Construction | Mar 27, 2017

Density and tall buildings

CRTKL’s Maren Striker examines Europe’s desire to build upward.

Architects | Mar 9, 2017

Watch Frank Lloyd Wright and Buckminster Fuller discuss architecture in animated video shorts

Given more time, Wright wanted to rebuild the country and change the nation.

Architects | Mar 6, 2017

Demolished Frank Lloyd Wright buildings get new life with photorealistic renderings

Architect David Romero recreated the Larkin Administration Building and the Rose Pauson House with detailed, fully colored renderings.

Building Team | Mar 6, 2017

AEC firms: Your website is one of the most important things you'll build

Don’t believe it? You’d better take a look at the research.

Architects | Mar 3, 2017

Hoffmann Architects’ Leadership Elected President of Three Industry Organizations

Maureen Dobbins, Lawrence Keenan, and Arthur Sanders to lead chapters of BOMA, AIA, and ICRI.

Office Buildings | Mar 2, 2017

White paper from Perkins Eastman and Three H examines how design can inform employee productivity and wellbeing

This paper is the first in a planned three-part series of studies on the evolution of diverse office environments and how the contemporary activity-based workplace (ABW) can be uniquely tailored to support a range of employee personalities, tasks and work modes.

Building Team | Mar 1, 2017

Intuitive wayfinding: An alternate approach to signage

Intuitive wayfinding is much like navigating via waypoints—moving from point to point to point.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021