Historic Building Gets New Life on Campus

Sponsored Content Reconstruction & Renovation

Historic Building Gets New Life on Campus

The renovation of the historic Tobey Building provided one of the most state-of-the-art HVAC systems in the U.S.


By Viega | February 16, 2016

Tobey Building on the NH Hospital campus in Concord, NH

The industrial-style Tobey Building on the New Hampshire Hospital campus in Concord, NH, was renovated and is now considered to have one of the most state-of-the-art HVAC systems in the U.S.

SAM Mechanical Services, LLC, a commercial plumbing and HVAC company in New Hampshire, helped the facility and Lavalle Brensinger Architects design and install the new HVAC system.

This unique, green cooling system significantly reduces cooling costs. Power plants that serve New Hampshire must keep their output stable in order to provide needed electricity during peak daytime hours, but during off-peak hours overnight, the unused electricity goes to waste. As a result, local power plants provide special pricing during off-peak hours, which is metered separately. The off-peak ice storage production cooling system uses this reduced-rate electricity to its greatest advantage.

The system uses chillers to make and store ice in underground tanks overnight. During the day, when other buildings of comparable size have chiller systems running full bore, the Tobey Building is saving money by cooling with a recirculating water loop integrated into the underground ice tanks.

SAM Mechanical installed Viega MegaPress® fittings for the chilled water applications, an additional savings factor for the building. “We had several miles of pipe on each floor,” said Steve April, owner of SAM Mechanical. “It was a green design concept where everyone else’s bid went with geothermal.”

An efficient system all around, the time required to transition the Tobey Building into this unique system was critical, given the number of components that had to come together to make it happen and perform to required specifications.

“From our perspective, we were able to pipe it up in less time and overall less cost using Viega MegaPress fittings,” April said. “It cuts labor in so many ways and removes the sometimes frequent problem of threading and cutting equipment that’s not working properly. The Tobey job, which had thousands of fittings, saved at least 50% of piping installation time.”

Viega has the only press system for black iron pipe installations that covers hydronic applications with MegaPress and Viega MegaPressG for gas systems. With system-matched tools and jaws, press connections are made in less than seven seconds, making Viega MegaPress suitable for virtually any type of project. For the Tobey Building, where time and quality counted, SAM Mechanical trusted Viega to get the job done right the first time.

“I would encourage anyone considering using Viega MegaPress to do so,” April said. “At the end of the day, a big job can have a substantial savings especially in labor. As far as the Tobey Building, with that many fittings it was important to choose a product that wouldn’t leak, giving me peace of mind that I helped keep this historical building safe and secure for decades to come.”

 

Viega MegaPress used for chilled water in HVAC system

 

 

For more information, visit www.viega.us.

Viega

800.976.9819

insidesales@viega.us

www.viega.us

Related Stories

| Jun 17, 2013

New North Tower opens at Greensboro, N.C.’s Moses Cone Hospital expansion/renovation

A $200 million expansion and renovation at Moses H. Cone Memorial Hospital in Greensboro, N.C. reached a big milestone this month with the opening of the new North Tower.  

| Jun 13, 2013

L.A.'s natural history museum completes reimagining of buildings and grounds

The Natural History Museum of Los Angeles completed a full-scale transformation this month with the opening of its new Nature Gardens and Nature Lab and the Otis Booth Pavilion with an iconic Fin Whale specimen. 

| May 31, 2013

$3 million renovation leads to rebirth of Boston hotel with new upscale identity

After a $3 million renovation, the Bulfinch Hotel in Boston has been reborn as the Boxer, a more upscale property.

| May 28, 2013

Renovated casino part of redevelopment project at Los Angeles-area racetrack

Hollywood Park racetrack in Inglewood, Calif., will soon become Hollywood Park Tomorrow, a 238-acre development project.

| May 2, 2013

New web community aims to revitalize abandoned buildings

Italian innovators Andrea Sesta and Daniela Galvani hope to create a worldwide database of abandoned facilities, ripe for redevelopment, with their [im]possible living internet community.

boombox1
boombox2
native1

More In Category


Adaptive Reuse

Empty mall to be converted to UCLA Research Park

UCLA recently acquired a former mall that it will convert into the UCLA Research Park that will house the California Institute for Immunology and Immunotherapy at UCLA and the UCLA Center for Quantum Science and Engineering, as well as programs across other disciplines. The 700,000-sf property, formerly the Westside Pavilion shopping mall, is two miles from the university’s main Westwood campus. Google, which previously leased part of the property, helped enable and support UCLA’s acquisition.


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021