A 95,000-sf, three-story healthcare facility is currently under construction directly adjacent to the 101 Freeway overlooking a wooded park site in San Jose, Calif. The $40 million V.A. San Jose Community-Based Outpatient Clinic will provide veterans and their families with healthcare services.
The building is being designed as a “healing oasis” that is inspired by scenic views of the Santa Cruz Mountains. It will allow patients, families, and care providers to connect with the outdoors via a park and other outdoor recreational areas. “The concept is based on incorporating air, light and space so the design becomes a part of the healing process for patients,” says Hosam Habib, AIA, Lead Designer, Hoefer Wysocki, in a release.
Rendering courtesy Hoefer Wysocki.
The space will use a modular floor plan to separate patient and staff corridors, which reduces noise and activity levels and contributes to a better healing environment.
The first floor will include general registration, imaging, a lab and pharmacy, and a mental health outpatient clinic. The second floor will be designed for outpatient services including primary care, audiology and speech pathology, podiatry, optometry, and dermatology. The third floor will be dedicated to specialty services such as a women’s health clinic. An outdoor terrace will also be located on the third floor to provide a space for patients, their families, and clinic staff to relax. The campus will also feature a memorial park to honor and thank veterans for their service.
Rendering courtesy Hoefer Wysocki.
The clinic is under construction and scheduled for occupancy in first quarter 2018. The Building Team includes Smith and Boucher (MEP), BKF (CE), BDC (structural engineer), and Gates and Associates (landscape consultant).
Rendering courtesy Hoefer Wysocki.
Related Stories
Healthcare Facilities | Apr 20, 2018
Revamping pharmacies for public safety and compliance
Released in February 2016, the latest standards of the United States Pharmacopeia’s Chapter 800 Pharmaceutical Compounding—Sterile Preparations builds on earlier regulations set forth by USP 797.
Healthcare Facilities | Apr 16, 2018
JE Dunn Construction and Hoefer Wysocki Architects selected for Sheppard Air Force Base Medical/Dental Clinic design-build contract
The project is targeting LEED Silver certification.
Healthcare Facilities | Mar 28, 2018
Sound health: How tranquility rooms can heal caregivers
Sound can also be healing. It promotes a culture of quietness and enhances environments, not just for patients but also for caretakers.
Healthcare Facilities | Mar 19, 2018
New York’s only freestanding pediatric health facility completed on the Buffalo Niagara Medical Campus
Shepley Bulfinch designed the project.
Healthcare Facilities | Mar 5, 2018
Four tips for designing the hospital of the future
What exactly is the hospital of future? Or more specifically, what is the future of healthcare design?
Healthcare Facilities | Feb 28, 2018
Healthcare operations: The good and bad of the ‘visit per room per day’ metric
Merely pursuing a high “visit per room per day” metric may drive up other resource needs and, in turn, raise operational costs, writes HDR's Zhanting Gao.
Healthcare Facilities | Feb 21, 2018
New $412 million advanced research center hopes to attract scientists and clinicians in pediatric biomedical research
The Crump Firm is designing the project.
Healthcare Facilities | Feb 16, 2018
Cancer centers' 'one-stop shop'
Healthcare systems ask their AEC partners for design flexibility that is adjustable to advances in medicine and technology.
Healthcare Facilities | Feb 14, 2018
Satellite centers keep cancer treatment closer to patients' orbit
This treatment center is half new construction, half renovation of a building that had been used for family services.
Healthcare Facilities | Feb 1, 2018
Early supplier engagement provides exceptional project outcomes
Efficient supply chains enable companies to be more competitive in the marketplace.