A 95,000-sf, three-story healthcare facility is currently under construction directly adjacent to the 101 Freeway overlooking a wooded park site in San Jose, Calif. The $40 million V.A. San Jose Community-Based Outpatient Clinic will provide veterans and their families with healthcare services.
The building is being designed as a “healing oasis” that is inspired by scenic views of the Santa Cruz Mountains. It will allow patients, families, and care providers to connect with the outdoors via a park and other outdoor recreational areas. “The concept is based on incorporating air, light and space so the design becomes a part of the healing process for patients,” says Hosam Habib, AIA, Lead Designer, Hoefer Wysocki, in a release.
Rendering courtesy Hoefer Wysocki.
The space will use a modular floor plan to separate patient and staff corridors, which reduces noise and activity levels and contributes to a better healing environment.
The first floor will include general registration, imaging, a lab and pharmacy, and a mental health outpatient clinic. The second floor will be designed for outpatient services including primary care, audiology and speech pathology, podiatry, optometry, and dermatology. The third floor will be dedicated to specialty services such as a women’s health clinic. An outdoor terrace will also be located on the third floor to provide a space for patients, their families, and clinic staff to relax. The campus will also feature a memorial park to honor and thank veterans for their service.
Rendering courtesy Hoefer Wysocki.
The clinic is under construction and scheduled for occupancy in first quarter 2018. The Building Team includes Smith and Boucher (MEP), BKF (CE), BDC (structural engineer), and Gates and Associates (landscape consultant).
Rendering courtesy Hoefer Wysocki.
Related Stories
Engineers | Aug 22, 2018
An electrical engineer’s take on designing successful pharmaceutical lab space
Patrick Licklider, PE, CEM, GGP, LEED AP BD+C, an electrical engineer in Clark Nexsen’s Science + technology practice, shares his perspective on what it takes to successfully design laboratory and manufacturing environments for the fast-changing pharmaceutical and biotech industry.
Healthcare Facilities | Aug 3, 2018
Seismic deadlines approaching for healthcare companies
California hospitals can save money with a holistic approach to retrofit issues.
Healthcare Facilities | Jul 30, 2018
Best in healthcare design 2018: Seven projects win AIA/AAH Healthcare Design Awards
The Steven Holl-designed Maggie’s Centre Barts cancer treatment facility in London highlights the honorees of the AIA Academy of Architecture for Health 2018 Healthcare Design Awards.
Healthcare Facilities | Jul 26, 2018
Healthcare market trends 2018: Health systems get leaner, more resilient
Hospitals set their sights on improving patient convenience and operational efficiency.
Healthcare Facilities | Jul 11, 2018
5 ways design is transforming behavioral healthcare
Circadian lighting, calming materials, and transparency are helping to normalize the patient experience in behavioral healthcare.
Healthcare Facilities | Jul 10, 2018
HGA designs acute care hospital for MetroHealth in Cleveland
The facility’s master plan creates a ‘hospital in a park.’
BIM and Information Technology | Jul 9, 2018
Healthcare and the reality of artificial intelligence
Regardless of improved accuracy gains, caregivers may struggle with the idea of a computer logic qualifying decisions that have for decades relied heavily on instinct and medical intuition.
Healthcare Facilities | Jun 28, 2018
New Stanford Healthcare outpatient building opens in Redwood City
The facility recently celebrated its grand opening with a ribbon-cutting ceremony.
Healthcare Facilities | Jun 26, 2018
The future of the ambulatory surgery centers and acuity levels
Offering the one-two punch of cost savings and convenience, ASCs are increasingly becoming the venue of choice for both physicians and patients.
Healthcare Facilities | Jun 26, 2018
Mesquite, Texas to receive 60-acre ‘wellness village’
Construction is anticipated to begin on the initial phase in mid-2019.