Hank Adams, AIA, ACHA, EDAC has been promoted to director of the healthcare program for HDR Architecture. A vice president with the firm, Adams has more than 25 years of healthcare architectural experience and has managed dozens of healthcare projects ranging from complete replacement facilities to multi-phased master plan implementations.
“All of us at HDR are proud of the design creativity, intellectual capital, and hard work that have contributed to building our global design and consulting practice. I am both honored and humbled to be leading the healthcare program; our work is not only a catalyst for change in healthcare delivery, but it impacts the health and well-being of the world,” Adams noted. “As we move forward, my vision for HDR is to be a trusted partner to our healthcare clients. We are helping them successfully navigate through the rapid evolution of modern medicine, economic shifts, and health policy changes toward a sustainable healthcare delivery system that meets the needs of both current and future generations. We’re curious, energized, and prepared to meet this challenge.”
“Hank’s passion for healthcare and his insight into the entire continuum of care made him the natural choice for leading our healthcare program,” said Doug Wignall, AIA, LEED AP, president of HDR Architecture. “His experience provides a unique and comprehensive understanding of the design, management, and technical aspects of complex healthcare projects. He also works diligently to foster an environment that will continue to inspire our skilled and imaginative leaders who are staying one step ahead of the changing paradigm that is 21st-century healthcare.”
Adams has extensive firm leadership experience as a healthcare principal, project manager, healthcare planner, and business developer. As director of HDR’s healthcare program, he provides strategic leadership and overall direction for the program and commits the necessary resources of the firm to successfully complete healthcare projects that embody the firm's clients’ visions and goals. In addition, Adams is an integral member of the design team for the $1.2 billion Parkland replacement hospital project in Dallas, serving as the design manager for the HDR + Corgan Joint Venture Design Team and providing overall leadership and direction to the integrated project delivery team of healthcare design and construction experts.
Adams is based in the firm’s Dallas office. He holds a Bachelor of Architecture degree from Oklahoma State University, and is an active member of the American College of Healthcare Architects (ACHA).
Related Stories
Smart Buildings | Apr 28, 2014
Cities Alive: Arup report examines latest trends in urban green spaces
From vertical farming to glowing trees (yes, glowing trees), Arup engineers imagine the future of green infrastructure in cities across the world.
| Apr 25, 2014
How the 'digital natives' will transform your Building Team
The newest generation to enter the workforce is like no other that has come before it. This cohort is the first to grow up with the Internet, mobile technologies, and an “always connected” lifestyle.
| Apr 25, 2014
A radiant barrier FAQ: Everything you wanted to know but were afraid to ask
There are many examples of materials developed for the space program making their way into everyday life and radiant barriers are just that. SPONSORED CONTENT
| Apr 25, 2014
6 winners selected for the Architectural League Prize
The Architectural League Prize, created in 1981, "recognizes exemplary and provocative work by young practitioners and provides a public forum for the exchange of their ideas," according to The Architectural League.
| Apr 24, 2014
Unbuilt and Famous: LEGO releases box set of Bjarke Ingels' LEGO museum
LEGO Architecture has created a box set that customers can use to build replicas of the LEGO Museum, which is not yet built in real life. The museum, designed by the Bjarke Ingels Group, will commemorate the history of LEGO.
| Apr 23, 2014
Ahead of the crowd: How architects can utilize crowdsourcing for project planning
Advanced methods of data collection, applied both prior to design and after opening, are bringing a new focus to the entire planning process.
| Apr 23, 2014
Developers change gears at Atlantic Yards after high-rise modular proves difficult
At 32 stories, the B2 residential tower at Atlantic Yards has been widely lauded as a bellwether for modular construction. But only five floors have been completed in 18 months.
| Apr 23, 2014
Experimental bot transfers CAD plans onto construction sites
The Archibot is intended to take technical data and translate it into full-scale physical markings on construction sites.
| Apr 23, 2014
Mean and Green: Top 10 green building projects for 2014 [slideshow]
The American Institute of Architects' Committee on the Environment has selected the top ten examples of sustainable architecture and ecological design projects that protect and enhance the environment. Projects range from a project for Portland's homeless to public parks to a LEED Platinum campus center.
| Apr 23, 2014
Architecture Billings Index dips in March
The March ABI score was 48.8, down sharply from a mark of 50.7 in February. This score reflects a decrease in design services.