flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gypsum Association releases updates to wallboard repair standards

Gypsum Association releases updates to wallboard repair standards

Recommendations for repairing joint ridging and fastener pops featured


By BD+C Staff | July 31, 2014
Photo: Findoutwhy via Wikimedia Commons
Photo: Findoutwhy via Wikimedia Commons

The Gypsum Association released updates to both GA-221 Repair of Joint Ridging and GA-222 Repairing Screw or Nail Pops standards publications. Each set of recommendations clarifies best practices associated with common wallboard repairs.

Joint ridging, or beading, is a uniform, fine linear deformation that occurs at the joints of finished and decorated gypsum panel products. Compression at the edges or ends of the panels due to extreme fluctuations of temperature and humidity is the most common cause of ridging; however, misaligned framing can also contribute to the problem. The Gypsum Association recommends waiting until a new structure has experienced at least one complete heating/cooling cycle before making repairs.

Fastener popping occurs most commonly from lumber shrinkage due to initially high moisture content in newly constructed wood framing. Overly long fastener length contributes to the problem. While fastener popping that appears before or during finishing and decoration should be repaired immediately; popping that occurs a month or more into the heating season should wait for repair until the season’s end.

In the case of fastener popping, the secure reattachment of the gypsum panel product to the framing is essential. All new screws or nails should be of the proper length. Key to the repair methods outlined in both GA-221-14 and GA-222-14 is careful sanding and treatment with joint compound as well as observing recommended drying times prior to redecoration.

(https://www.gypsum.org/2014/07/just-released-updated-recommendations-for-gypsum-panel-product-repairs/)

Related Stories

Codes and Standards | Jun 29, 2020

Mandated building retrofits are necessary to meet climate crisis

Performance standards could greatly reduce GHG emissions.

Codes and Standards | Jun 29, 2020

New buildings can fall short of designed performance

Similar structures can produce different energy usage results.

Codes and Standards | Jun 25, 2020

Arc offers tools, analytics for safe workplace re-entry

Platform helps sustainability teams to collect data, benchmark progress, measure impact, and improve performance.

Codes and Standards | Jun 24, 2020

New API enables design and construction technology platforms to connect

Construction Specifications Institute offers “digital classification engine.”

Codes and Standards | Jun 23, 2020

State lawmakers encouraging transition to heat pumps for building heating

Policies aim to replace gas heaters with electric units.

Codes and Standards | Jun 22, 2020

Natl. Renewable Energy Labs, Cold Climate Research Ctr. team up on extreme weather research

Focus on renewable power, sustainable transportation, energy efficiency, and energy systems integration.

Codes and Standards | Jun 19, 2020

Demand for family rentals expected to jump over next few years

Developers’ focus on single, urban millennials leaves family market underserved.

Codes and Standards | Jun 17, 2020

AIA offers retail and office 3D models for reducing risk of COVID-19 transmission

For modifying stores and offices with 17-point architectural, engineering, and administrative framework.

Codes and Standards | Jun 17, 2020

Santa Fe is second city in the world to achieve LEED v4.1 Gold

New Mexico community gained credits for resilience planning, including public health crises.

Codes and Standards | Jun 15, 2020

NSF International’s Checked by NSF program helps businesses reopen safely

Includes third-party validation of COVID-19 preventive measures.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021