flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gypsum Association releases updates to wallboard repair standards

Gypsum Association releases updates to wallboard repair standards

Recommendations for repairing joint ridging and fastener pops featured


By BD+C Staff | July 31, 2014
Photo: Findoutwhy via Wikimedia Commons
Photo: Findoutwhy via Wikimedia Commons

The Gypsum Association released updates to both GA-221 Repair of Joint Ridging and GA-222 Repairing Screw or Nail Pops standards publications. Each set of recommendations clarifies best practices associated with common wallboard repairs.

Joint ridging, or beading, is a uniform, fine linear deformation that occurs at the joints of finished and decorated gypsum panel products. Compression at the edges or ends of the panels due to extreme fluctuations of temperature and humidity is the most common cause of ridging; however, misaligned framing can also contribute to the problem. The Gypsum Association recommends waiting until a new structure has experienced at least one complete heating/cooling cycle before making repairs.

Fastener popping occurs most commonly from lumber shrinkage due to initially high moisture content in newly constructed wood framing. Overly long fastener length contributes to the problem. While fastener popping that appears before or during finishing and decoration should be repaired immediately; popping that occurs a month or more into the heating season should wait for repair until the season’s end.

In the case of fastener popping, the secure reattachment of the gypsum panel product to the framing is essential. All new screws or nails should be of the proper length. Key to the repair methods outlined in both GA-221-14 and GA-222-14 is careful sanding and treatment with joint compound as well as observing recommended drying times prior to redecoration.

(https://www.gypsum.org/2014/07/just-released-updated-recommendations-for-gypsum-panel-product-repairs/)

Related Stories

Codes and Standards | Jun 19, 2020

Demand for family rentals expected to jump over next few years

Developers’ focus on single, urban millennials leaves family market underserved.

Codes and Standards | Jun 17, 2020

AIA offers retail and office 3D models for reducing risk of COVID-19 transmission

For modifying stores and offices with 17-point architectural, engineering, and administrative framework.

Codes and Standards | Jun 17, 2020

Santa Fe is second city in the world to achieve LEED v4.1 Gold

New Mexico community gained credits for resilience planning, including public health crises.

Codes and Standards | Jun 15, 2020

NSF International’s Checked by NSF program helps businesses reopen safely

Includes third-party validation of COVID-19 preventive measures.

Codes and Standards | Jun 15, 2020

Workers want policy changes before they return to offices

More office cleaning, work from home opportunities, and staying home when sick among the desired adjustments.

Codes and Standards | Jun 12, 2020

Carbon emission legislation prompts commercial real estate to innovate

Mass timber, augmented reality, and modular construction among the trends.

Codes and Standards | Jun 11, 2020

USGBC offers new pilot credit to address green cleaning and COVID-19

Provides guidance on cleaning and disinfecting buildings using green cleaning best practices.

Codes and Standards | Jun 10, 2020

AIA issues tools for reducing risk of COVID-19 transmission in buildings

Tailored strategies offered for offices, retailers, schools, and senior living facilities.

Codes and Standards | Jun 8, 2020

OSHA construction safety inspections fall 84% during COVID-19 pandemic

Agency focuses on preventing disease transmission in healthcare industry.

Codes and Standards | Jun 8, 2020

5 must reads for the AEC industry today: June 8, 2020

Frank Lloyd Wright sites set to reopen and construction jobs rise by 464,000.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021