flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GSA posts new RFI for enabling energy efficiency, decarbonization in commercial buildings

Government Buildings

GSA posts new RFI for enabling energy efficiency, decarbonization in commercial buildings

Agency wants to test new technologies in federal buildings


By Peter Fabris, Contributing Editor | August 19, 2024
GSA posts new RFI for enabling energy efficiency, decarbonization in commercial buildings Image by furud from Pixabay

Image by furud from Pixabay

The U.S. General Services Administration (GSA), in collaboration with the U.S. Department of Energy, recently released a new Request For Information (RFI) focused on enabling energy efficiency and decarbonization in commercial buildings.

GSA wants to test innovative technologies through GSA’s Center for Emerging Building Technologies. As part of GSA’s Center for Emerging Building Technologies, new clean energy and decarbonization technologies will be tested in federal buildings.

The Center consists of three interconnected programs: the Green Proving Ground, the Applied Innovation Learning Lab, and Pilot to Portfolio. By testing new building technologies in federal buildings, these programs will help GSA make smarter investments and enable and encourage wider market adoption of clean energy innovations, according to a GSA news release.

The new RFI seeks to identify emerging and sustainable technologies in the following categories:

  • Deep Energy Retrofits
  • All-Electric Buildings and All-Electric Vehicle Fleets
  • Healthy and Resilient Buildings
  • Low-Embodied Carbon Building Materials
  • Net-Zero Operations
  • Packages of Emerging and Sustainable Technology Solutions

Submissions must be technologies and solutions that are technically and commercially ready for evaluation in occupied, operational buildings. The government will pilot selected technologies.

Related Stories

| Nov 16, 2011

Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.

This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.

| Nov 11, 2011

How Your Firm Can Win Federal + Military Projects

The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.

| Nov 10, 2011

Skanska Moss to expand and renovate Greenville-Spartanburg International Airport

The multi-phase terminal improvement program consists of an overall expansion to the airport’s footprint and major renovations to the existing airport terminal.

| Nov 10, 2011

Suffolk Construction awarded MBTA transit facility and streetscape project

The 21,000-sf project will feature construction of a cable-stayed pedestrian bridge over Ocean Avenue, an elevated plaza deck above Wonderland MBTA Station, a central plaza, and an at-grade pedestrian crossing over Revere Beach Boulevard

| Oct 12, 2011

Building a Double Wall

An aged federal building gets wrapped in a new double wall glass skin.

| Oct 12, 2011

Consigli Construction breaks ground for Bigelow Laboratory Center for Ocean Health

  Consigli to build third phase of 64-acre Ocean Science and Education Campus, design by WBRC Architects , engineers in association with Perkins + Will

| Oct 6, 2011

GREENBUILD 2011: Growing green building market supports 661,000 green jobs in the U.S.

Green jobs are already an important part of the construction labor workforce, and signs are that they will become industry standard.

| Sep 26, 2011

Copper helps serve and protect Lightning Alley

Copper grounding upgrades add protection and reliability to Florida Sheriff's Department.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




Government Buildings

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021