flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GSA posts new RFI for enabling energy efficiency, decarbonization in commercial buildings

Government Buildings

GSA posts new RFI for enabling energy efficiency, decarbonization in commercial buildings

Agency wants to test new technologies in federal buildings


By Peter Fabris, Contributing Editor | August 19, 2024
GSA posts new RFI for enabling energy efficiency, decarbonization in commercial buildings Image by furud from Pixabay

Image by furud from Pixabay

The U.S. General Services Administration (GSA), in collaboration with the U.S. Department of Energy, recently released a new Request For Information (RFI) focused on enabling energy efficiency and decarbonization in commercial buildings.

GSA wants to test innovative technologies through GSA’s Center for Emerging Building Technologies. As part of GSA’s Center for Emerging Building Technologies, new clean energy and decarbonization technologies will be tested in federal buildings.

The Center consists of three interconnected programs: the Green Proving Ground, the Applied Innovation Learning Lab, and Pilot to Portfolio. By testing new building technologies in federal buildings, these programs will help GSA make smarter investments and enable and encourage wider market adoption of clean energy innovations, according to a GSA news release.

The new RFI seeks to identify emerging and sustainable technologies in the following categories:

  • Deep Energy Retrofits
  • All-Electric Buildings and All-Electric Vehicle Fleets
  • Healthy and Resilient Buildings
  • Low-Embodied Carbon Building Materials
  • Net-Zero Operations
  • Packages of Emerging and Sustainable Technology Solutions

Submissions must be technologies and solutions that are technically and commercially ready for evaluation in occupied, operational buildings. The government will pilot selected technologies.

Related Stories

| Mar 1, 2012

Reconstruction Awards: Reinvesting in a neighborhood’s future

The reconstruction of a near-century-old derelict public works facility in Minneapolis earns LEED Platinum—and the hearts and minds of the neighboring community.

| Feb 26, 2012

Hollister Construction awarded 42,000-sf office fit-out in Holtsville, N.Y.

Space leased by U.S. General Service Administration.

| Feb 22, 2012

Suffolk awarded Boston post office renovation project

Renovation of art deco landmark will add 21,000 square feet of retail and 110 new parking spaces.

| Feb 14, 2012

SAIC selected for architectural and engineering design services at Lajes Field, Azores

SAIC’s services will include a broad variety of new construction projects and maintenance and repair projects

| Jan 4, 2012

New LEED Silver complex provides space for education and research

The academic-style facility supports education/training and research functions, and contains classrooms, auditoriums, laboratories, administrative offices and library facilities, as well as spaces for operating highly sophisticated training equipment.

| Dec 8, 2011

Keast & Hood Co. part of Statue of Liberty renovation team

Keast & Hood Co., is the structural engineer-of-record for the year-long $27.25 million renovation of the Statue of Liberty. 

| Dec 5, 2011

Fraser Brown MacKenna wins Green Gown Award

Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

| Nov 22, 2011

Saskatchewan's $1.24 billion carbon-capture project

The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




Government Buildings

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021