flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GSA adopts SITES land development and management rating system

Codes and Standards

GSA adopts SITES land development and management rating system

Federal agency will use for properties with and without buildings.


By Peter Fabris, Contributing Editor | April 25, 2016
GSA adopts SITES land development and management rating system

Built on a industrial brownfield, the Perot Museum of Nature and Science in Dallas is a SITES project. Photo: Joe Mabel/Wikimedia Commons.

The U.S. General Services Administration (GSA) has adopted the SITES rating system for its capital construction program. 

Green Business Certification Inc.’s SITES is a program for sustainable land development and management and is used by landscape architects, engineers, architects, developers, and policymakers to align land development with innovative sustainable design. SITES certification is for development projects located on sites with or without buildings including national parks, corporate campuses, streetscapes, homes, and more.

GSA is one of the largest and most diversified public real estate organizations in the world with a portfolio of 376.9 million rentable square feet in 8,721 active assets, and more than 144,000 acres of land, including ports of entry and historical properties. The GSA determined that incorporating SITES into the program offers a highly effective and efficient way to ensure environmental performance to meet federal goals on various capital project types.

The rating system provides a metrics-based approach to important concepts like ecosystem services and green infrastructure. The GSA’s decision is incorporated in the 2016 version of Facilities Standards for the Public Buildings Service (P-100), which establishes design standards and criteria for new buildings, infrastructural projects, major and minor alternations, and work in historic structures for the Public Buildings Service (PBS) of the GSA. This document contains both policy and technical criteria used in the programming, design, and documentation of GSA buildings and facilities.

Related Stories

Codes and Standards | Jan 3, 2020

Car-free streets could become common in major cities

New York and San Francisco establish thoroughfares dedicated to transit, pedestrians.

Codes and Standards | Jan 2, 2020

CRE professionals have increased interest in embodied carbon accounting, smart buildings

Survey also shows that interest in resiliency lags behind.

Codes and Standards | Jan 2, 2020

White paper focuses on Metal Composite Material labeling

Document part of effort to uphold industry standards for the product.

Codes and Standards | Dec 18, 2019

Hard Rock Hotel collapse in New Orleans puts spotlight on undocumented workers

Having helped rebuild the city after Hurricane Katrina, many under threat of deportation.

Codes and Standards | Dec 18, 2019

Maryland lawmakers take on blocked sidewalks during construction projects

Legislation clarifies developers’ responsibilities.

Codes and Standards | Dec 18, 2019

New York City passes legislation to prevent bird strikes on buildings

Requires bird-safe materials on first 75 feet of a structure.

Codes and Standards | Dec 16, 2019

New Buildings Institute seeks entries for Zero Buildings Database

Listing illustrates feasibility of ultra low-energy buildings.

Codes and Standards | Dec 13, 2019

USGBC launches new tool to prioritize sustainability strategies

Highlights building design features that can lead to better performance.

Codes and Standards | Dec 12, 2019

Coalition calls for consistent building data disclosure regulations in Canada

Major real estate firms are driving the effort.

Codes and Standards | Dec 10, 2019

Utilities rolling out more grid-interactive efficient building programs

Focus is on energy savings and demand flexibility.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021