Hotels are expected to spend $5 billion on improvements this year, 33% more than in 2011, says Bjorn Hanson, a dean at NYU’s Robert Tisch Center for Hospitality, Tourism and Sports Management. Most of that windfall will go into new bedding and flat-screen TVs, but a lot will go toward room renovations, lobby upgrades, additions, and new construction, including sustainably conceived projects.
For the Sheraton New York, Stantec oversaw a $153 million renovation that addressed energy waste and guest discomfort (due primarily to an wayward HVAC system) in the 53-story hotel. All 1,754 guestrooms were completely renovated with new systems that returned comfort control to guests. New central plant systems and 15 miles of hydronic piping were installed, cutting energy consumption by 14%.
A different approach to sustainability was taken by design firm Stonehill & Taylor for the recently completed $25 million renovation of the 533-room Hyatt Regency Minneapolis. Here, the emphasis was on the use of local materials and services whenever possible. Stone from a nearby quarry was used for bathroom countertops. Guestrooms feature works by local artists. About 80% of the furniture, fixtures, and equipment were produced in the U.S. and Canada. +
Related Stories
BIM and Information Technology | Apr 9, 2015
A carboard box by Google can bring virtual reality to architecture
The global search engine giant has launched a new product, Google Cardboard, that easily allows users to experience virtual reality.
Building Team Awards | Apr 9, 2015
Multifaced fitness center becomes campus landmark
A sloped running track and open-concept design put this Building Team to the test.
Building Team Awards | Apr 9, 2015
Nation's first LEED-certified bus depot
A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.
Building Team Awards | Apr 9, 2015
Setting the bar for port-of-entry design
Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.
Building Team Awards | Apr 9, 2015
Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C
Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.
Building Team Awards | Apr 9, 2015
IPD-driven fusion facility serves science and student life in Chicago
In dire need of modern science labs and a student union, North Park University built both—in the same building.
Building Team Awards | Apr 9, 2015
‘Prudent, not opulent’ sets the tone for this Catholic hospital
This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.
Building Team Awards | Apr 9, 2015
9/11 museum triumphs over controversy
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.
Building Team Awards | Apr 7, 2015
Unique test facility will help make wind power more feasible
A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.
Cultural Facilities | Apr 7, 2015
Mies’ Martin Luther King Jr. Library to get makeover
The architects say the modernization aims to improve “Mies in a contemporary Miesian way.”