flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Greenbuild 2012 Report: Hospitality

Greenbuild 2012 Report: Hospitality

Hotel boom signals good news for greener lodging facilities


By By Amy McIntosh, Associate Editor, Raissa Rocha, Associate Editor, and Rob Cassidy, Editorial Director | November 11, 2012
A ceiling-high stone fireplace framed by rustic wooden logs was created by artis
A ceiling-high stone fireplace framed by rustic wooden logs was created by artisans for the Hyatt Regency Minneapolis. Elsewhere
This article first appeared in the November 2012 issue of BD+C.

Hotels are expected to spend $5 billion on improvements this year, 33% more than in 2011, says Bjorn Hanson, a dean at NYU’s Robert Tisch Center for Hospitality, Tourism and Sports Management. Most of that windfall will go into new bedding and flat-screen TVs, but a lot will go toward room renovations, lobby upgrades, additions, and new construction, including sustainably conceived projects.

For the Sheraton New York, Stantec oversaw a $153 million renovation that addressed energy waste and guest discomfort (due primarily to an wayward HVAC system) in the 53-story hotel. All 1,754 guestrooms were completely renovated with new systems that returned comfort control to guests. New central plant systems and 15 miles of hydronic piping were installed, cutting energy consumption by 14%.

A different approach to sustainability was taken by design firm Stonehill & Taylor for the recently completed $25 million renovation of the 533-room Hyatt Regency Minneapolis. Here, the emphasis was on the use of local materials and services whenever possible. Stone from a nearby quarry was used for bathroom countertops. Guestrooms feature works by local artists. About 80% of the furniture, fixtures, and equipment were produced in the U.S. and Canada. +

Related Stories

High-rise Construction | Apr 22, 2015

Architects propose sustainable ‘vertical city’ in the Sahara

Designers aim to make the 1,476-foot tower sustainable, relying on rainwater collection, solar power, and geothermal energy.

Architects | Apr 22, 2015

Architecture Billings Index accelerates in March

For the second consecutive month, the Architecture Billings Index indicated a modest increase in design activity in March.

Green | Apr 22, 2015

AIA Committee on the Environment recognizes Top 10 Green Projects

Seattle's Bullitt Center and the University Center at The New School are among AIA's top 10 green buildings for 2015.

Museums | Apr 22, 2015

Check out Ralph Johnson's stunning nature-inspired Shanghai museum

The newly opened Shanghai Natural History Museum, designed by Perkins+Will’s Global Design Director Ralph Johnson, mimics the shape of a nautilus shell, and features natural elements throughout. 

Green | Apr 22, 2015

GSA's Federal Center South Building honored with AIA Top Ten Plus Award for 'verified' sustainable performance

The annual award recognizes green building projects that have quantifiable metrics demonstrating the performance and positive impact of the sustainable design.

Architects | Apr 21, 2015

Megatrends shaping commercial building design

Gensler’s 2015 Design Forecast focuses on how changes in demographics, workplace preferences, and technology are affecting how and why structures get built.

Office Buildings | Apr 21, 2015

Stop the endless debate over open vs. closed work environments

Rather than be confused by the constant stream of opinions, leadership teams contemplating workplace investments should start with powerful employee engagement strategies that drive results.

BIM and Information Technology | Apr 21, 2015

Software tools shouldn't dictate the AEC process

With over 200 solutions on the market, construction software is one of the most complex and fragmented markets, writes Gensler's Mark Thole.

Cultural Facilities | Apr 20, 2015

Jean Nouvel loses court battle against Philharmonie de Paris over alleged design ‘sabotage’

Nouvel boycotted the January opening of the facility and asked for his name to be removed from all references to the work. 

Contractors | Apr 20, 2015

Too many construction projects don’t meet owners’ expectations: KPMG report

Causes for delays, overruns, and underperformance include project management talent shortages, distrust between owners and contractors, and the lack of fully integrated project management systems.     

boombox1
boombox2
native1

More In Category




Government Buildings

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021