From the reclaimed barn wood building materials to the soy ink signage, the new booth created by Kohler Co. for the Greenbuild International Conference and Expo was planned to leave a big impression while following the U.S. Green Building Council’s green tradeshow guidelines.
Inside the booth are many of the company’s innovative water-saving products, showcased in the kind of gracious, forward-thinking setting for which Kohler has become renowned.
“Greenbuild is about innovation in all aspects of all processes. In keeping with that, we looked at how we planned and executed a tradeshow in a completely new way,” commented Rob Zimmerman, engineering manager for water conservation and sustainability at Kohler. “To be genuinely conscientious, we had to analyze every element right down to what happens to the booth and its contents after the show is over.”
The Kohler booth is made up of four distinct suites: three common commercial spaces (a hotel restroom, a stadium restroom, and a healthcare restroom) and a residential space to show visitors how they can impact the environment by using water-conserving technologies and sustainable products. The attention to the materials used for these vignettes and the conservational nature of the overall display were planned out to the smallest details.
All displays were designed to fit into one 53-foot truck to limit the transportation costs.
The structures are built from reclaimed barn wood, and portions of the booth will be reused for other shows.
The products will be donated after the show and all the other building materials were designed for repackaging upon return shipment. BD+C
Related Stories
| Nov 17, 2011
Campus-wide energy-efficiency program aims to deliver $3.5 million in energy and operational savings
Merced College and Honeywell will use the school’s energy usage statistics to develop a course curriculum on sustainability, and raise awareness among students of the positive impact conservation practices contribute to the community.
| Nov 17, 2011
Hollister Construction Services renovating bank in Union City, N.J.
Project is part of a series of ground-up construction and renovation assignments.
| Nov 16, 2011
Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.
This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.
| Nov 16, 2011
Architecture Billings Index moves upward
The Architecture Billings Index climbed nearly three points in October.
| Nov 16, 2011
CRSI recommends return to inch-pound markings
The intention of this resolution is for all new rollings of reinforcing steel products to be marked with inch-pound bar markings no later than January 1st, 2014.
| Nov 16, 2011
John Patelski joins Ghafari as executive vice president
As executive vice president, Patelski will be responsible for expanding the firm’s services in new strategic markets.
| Nov 15, 2011
Struggling economy demands construction industry embrace enterprise-wide risk management
In today’s business environment of high supply and limited demand, it has become especially vital for organizations in the construction sector to effectively manage risk.
| Nov 15, 2011
Suffolk Construction breaks ground on the Victor housing development in Boston
Project team to manage construction of $92 million, 377,000 square-foot residential tower.
| Nov 15, 2011
Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa
Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.