flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GREENBUILD 2011: Kohler builds sustainable booth at Greenbuild 2011

GREENBUILD 2011: Kohler builds sustainable booth at Greenbuild 2011


By By BD+C Staff | October 5, 2011
The Kohler booth is made up of four distinct suites: three common commercial spaces a hotel restroom, a stadium restroom, and

From the reclaimed barn wood building materials to the soy ink signage, the new booth created by Kohler Co. for the Greenbuild International Conference and Expo was planned to leave a big impression while following the U.S. Green Building Council’s green tradeshow guidelines.

Inside the booth are many of the company’s innovative water-saving products, showcased in the kind of gracious, forward-thinking setting for which Kohler has become renowned.

“Greenbuild is about innovation in all aspects of all processes. In keeping with that, we looked at how we planned and executed a tradeshow in a completely new way,” commented Rob Zimmerman, engineering manager for water conservation and sustainability at Kohler. “To be genuinely conscientious, we had to analyze every element right down to what happens to the booth and its contents after the show is over.”

The Kohler booth is made up of four distinct suites: three common commercial spaces (a hotel restroom, a stadium restroom, and a healthcare restroom) and a residential space to show visitors how they can impact the environment by using water-conserving technologies and sustainable products. The attention to the materials used for these vignettes and the conservational nature of the overall display were planned out to the smallest details.

All displays were designed to fit into one 53-foot truck to limit the transportation costs.

The structures are built from reclaimed barn wood, and portions of the booth will be reused for other shows.

The products will be donated after the show and all the other building materials were designed for repackaging upon return shipment. BD+C

Related Stories

| Nov 22, 2011

Saskatchewan's $1.24 billion carbon-capture project

The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.

| Nov 22, 2011

New Green Matters Conference examines emerging issues in concrete and sustainability

High-interest topics will be covered in technical seminars, including infrared reflective coatings for heat island mitigation, innovative uses of concrete to provide cooling and stormwater management, environmental benefits of polished concrete, and advancements in functional resilience of architectural concrete.

| Nov 22, 2011

Suffolk Construction selected as contractor for Boston luxury residential tower

Project team breaks ground on 488,000-sf building that will feature world-class amenities.

| Nov 22, 2011

Jones Lang LaSalle completes construction of two new stores in Manhattan

Firm creates new global design standard serving as project manager for Uniglo’s 89,000-sf flagship location and, 64,000-sf store.

| Nov 21, 2011

Mortenson and enXco partnership to build its 19th wind project

The 8,500 acres project will generate140 megawatts of wind power – enough energy to power approximately 39,000 homes.

| Nov 21, 2011

FDH Engineering acquires Energy Solutions

All ESI employees have been merged into FDH’s staff at its St. Louis office.

| Nov 18, 2011

Centre for Interactive Research on Sustainability opens

Designed to exceed LEED Platinum, the Centre for Interactive Research on Sustainability (CIRS) is one of the most innovative and high performance buildings in North America today, demonstrating leading-edge green building design products, technologies, and systems.

| Nov 17, 2011

SmithGroup changes name to SmithGroupJJR

SmithGroup and JJR join brands to become a single, multi-disciplinary company.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021