Kingspan Insulated Panels North America spotlighted its Environmental Product Declaration (EPD) as a centerpiece to the company’s main sustainability initiative Path to NetZero during Greenbuild 2011.
Visitors learned about the EPD recently awarded to the company’s wall and roof systems. Kingspan’s EPD is a first-of-its-kind achieved by a North American-based manufacturer of insulated metal panels. EPD is a standardized, internationally recognized tool for providing information on a product’s environmental impact. Information in the declaration is based on an ISO-compliant life cycle assessment (LCA) and verified by a third party, in the case of Kingspan, Underwriters Laboratories Inc.
The booth introduced visitors to the company’s updated Path to NetZero microsite and the next generation of the mobile app. This tool for the building industry simulates the process of achieving high-performance and net-zero buildings. The revised app includes the addition of two Canadian cities – Calgary and Toronto – giving users a choice of six cities. In addition to a city, users select a building type (school, office, or warehouse) and a baseline building designed to ASHRAE 90.1.2004. They then choose an insulated roof and wall system and compare savings. Benchmarks for the tool are aligned with the Department of Energy Commercial Building Initiative and U.S. Green Building Council Leadership in Energy and Environmental Design (LEED) 2009/3.0 requirements. BD+C
Related Stories
| Mar 5, 2012
Franklin Institute in Philadelphia selects Skanska to construct new pavilion
The building has been designed by SaylorGregg Architects and will apply for LEED Silver certification.
| Mar 2, 2012
By the Numbers
66 skyscrapers to built in China over six years; 1,000 questions in the Modern Architecture game; 21,000 new jobs.
| Mar 1, 2012
Intelligent construction photography, not just pretty pictures
Our expert tells how to organize construction progress photos so you don’t lose track of all the valuable information they contain.
| Mar 1, 2012
AIA: A clear difference, new developments in load-bearing glass
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Mar 1, 2012
8 tips for architects to consider before LED installation
Lighting experts offer Building Team members critical information to consider before upgrading lighting systems to LEDs.
| Mar 1, 2012
Reconstruction Awards: Reinvesting in a neighborhood’s future
The reconstruction of a near-century-old derelict public works facility in Minneapolis earns LEED Platinum—and the hearts and minds of the neighboring community.
| Mar 1, 2012
7 keys to ‘Highest value, lowest cost’ for healthcare construction
The healthcare design and construction picture has been muddied by uncertainty over the new healthcare law. Hospital systems are in a bind, not knowing what levels of reimbursement to expect. Building Teams serving this sector will have to work even harder to meet growing client demands.
| Mar 1, 2012
Cornell shortlists six architectural firms for first building on tech campus
Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.
| Mar 1, 2012
Aragon Construction completes 67,000-sf build-out in NYC
Aragon constructed the space in partnership with Milo Kleinberg Design Associates, (MKDA) and the Craven Corp. as the owner’s representative.