Kingspan Insulated Panels North America spotlighted its Environmental Product Declaration (EPD) as a centerpiece to the company’s main sustainability initiative Path to NetZero during Greenbuild 2011.
Visitors learned about the EPD recently awarded to the company’s wall and roof systems. Kingspan’s EPD is a first-of-its-kind achieved by a North American-based manufacturer of insulated metal panels. EPD is a standardized, internationally recognized tool for providing information on a product’s environmental impact. Information in the declaration is based on an ISO-compliant life cycle assessment (LCA) and verified by a third party, in the case of Kingspan, Underwriters Laboratories Inc.
The booth introduced visitors to the company’s updated Path to NetZero microsite and the next generation of the mobile app. This tool for the building industry simulates the process of achieving high-performance and net-zero buildings. The revised app includes the addition of two Canadian cities – Calgary and Toronto – giving users a choice of six cities. In addition to a city, users select a building type (school, office, or warehouse) and a baseline building designed to ASHRAE 90.1.2004. They then choose an insulated roof and wall system and compare savings. Benchmarks for the tool are aligned with the Department of Energy Commercial Building Initiative and U.S. Green Building Council Leadership in Energy and Environmental Design (LEED) 2009/3.0 requirements. BD+C
Related Stories
| Mar 1, 2012
Reconstruction Awards: Reinvesting in a neighborhood’s future
The reconstruction of a near-century-old derelict public works facility in Minneapolis earns LEED Platinum—and the hearts and minds of the neighboring community.
| Mar 1, 2012
7 keys to ‘Highest value, lowest cost’ for healthcare construction
The healthcare design and construction picture has been muddied by uncertainty over the new healthcare law. Hospital systems are in a bind, not knowing what levels of reimbursement to expect. Building Teams serving this sector will have to work even harder to meet growing client demands.
| Mar 1, 2012
Cornell shortlists six architectural firms for first building on tech campus
Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.
| Mar 1, 2012
Aragon Construction completes 67,000-sf build-out in NYC
Aragon constructed the space in partnership with Milo Kleinberg Design Associates, (MKDA) and the Craven Corp. as the owner’s representative.
| Mar 1, 2012
Bomel completes design-build parking complex at U.C. San Diego
The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level.
| Mar 1, 2012
Eidco Construction bolsters Chicago office
Eldco hires Peterson and Vivoda as senior project managers.
| Mar 1, 2012
Reconstruction of L.A.’s Dunbar Hotel underway
Withee Malcolm Architects’ designs for the project include the complete renovation of the Dunbar Hotel and the Somerville Apartments I and II.
| Feb 29, 2012
C.W. Driver opens new office, appoints Castillo regional SVP
Castillo will oversee projects with new and existing clients in northern California within the areas of education, healthcare/biomedical, public sector, military contracting, entertainment, retail, corporate and hospitality.
| Feb 29, 2012
Report says BIPV glass market to reach $6.4 billion by 2016
The report analyzes the opportunities for BIPV glass products using c-Si, thin-film and OPV/DSC materials and provides eight-year forecasts in terms of MW and square footage shipped as well as forecasts of revenue generated.
| Feb 29, 2012
Construction begins on Keller Army Community Hospital addition
The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.