Project: Medical Education Building, Emory School of Medicine, AtlantaArchitect: The S/L/A/M Collaborative (AE 31)Structural engineer: KSI Structural EngineersMEP engineer: Newcomb & Boyd (E 31)General contractor: The Whiting-Turner Contracting Co. (C 7)Photo: Courtesy The S/L/A/M Collaborative |
University construction spending is 13% higher than a year ago—mostly for residence halls and infrastructure on public campuses—and is expected to slip less than 5% over the next two years. However, the value of starts dropped about 10% in recent months and will not return to the 2007–08 peak for about two years.
Company | Billings ($) | |
Source: 2009 Giants 300 survey. For expanded university design rankings, visit: www.BDCnetwork.com/Giants | ||
1 | Burt Hill | 81,834,000 |
2 | HOK | 75,200,000 |
3 | AECOM Technology Corp. | 63,529,000 |
4 | Cannon Design | 51,084,000 |
5 | Perkins+Will | 48,000,000 |
6 | Gensler | 37,215,000 |
7 | SmithGroup | 36,948,750 |
8 | HDR Architecture | 33,940,000 |
9 | Arup | 33,000,000 |
10 | RMJM | 32,497,392 |
11 | Sasaki Associates | 30,950,000 |
12 | Ellerbe Becket | 28,299,184 |
13 | Dewberry | 28,270,000 |
14 | Jacobs | 27,144,560 |
15 | Affiliated Engineers | 27,132,120 |
16 | EYP Architecture & Engineering | 25,500,000 |
17 | Parsons Brinckerhoff | 25,098,000 |
18 | Stantec | 24,596,000 |
19 | URS Corp. | 21,000,000 |
20 | R.G. Vanderweil Engineers | 20,393,105 |
Company | Value put in place ($) | |
Source: 2009 Giants 300 survey. For expanded university contractor rankings, visit: www.BDCnetwork.com/Giants | ||
1 | Turner | 1,150,600,000 |
2 | Gilbane Building Co. | 703,599,820 |
3 | Whiting-Turner Contracting Co. | 492,258,678 |
4 | Structure Tone | 454,141,500 |
5 | Skanska USA Building | 427,071,221 |
6 | Swinerton Inc. | 299,360,000 |
7 | Webcor Builders | 293,807,692 |
8 | PCL Construction Enterprises | 288,471,629 |
9 | McCarthy Holdings | 277,101,000 |
10 | Flintco Cos., The | 254,428,800 |
11 | JE Dunn Construction Group | 248,391,000 |
12 | Mortenson Construction | 226,008,000 |
13 | Hoffman Construction | 224,000,000 |
14 | Bovis Lend Lease | 212,903,379 |
15 | Clark Group | 210,050,000 |
16 | Austin Industries | 208,199,672 |
17 | Hensel Phelps Construction | 200,220,000 |
18 | C.W. Driver | 177,710,764 |
19 | Hunt Construction Group | 175,000,000 |
20 | DPR Construction | 165,245,490 |
2009 | 2008 | Company | 2008 Billings ($) |
Rank | |||
Source: 2009 Giants 300 survey. For expanded Engineering Firmrankings, visit: www.BDCnetwork.com/Giants | |||
1 | 4 | Syska Hennessy Group | 115,600,000 |
2 | 2 | Fluor Corp. | 114,470,000 |
3 | 3 | KPFF Consulting Engineers | 81,000,000 |
4 | 6 | Affiliated Engineers | 75,367,000 |
5 | 5 | Smith Seckman Reid | 68,260,000 |
6 | 10 | Walter P Moore | 64,572,266 |
7 | 18 | Henderson Engineers | 58,350,590 |
8 | 14 | KJWW Engineering Consultants | 58,265,636 |
9 | 8 | R.G. Vanderweil Engineers | 55,116,500 |
10 | 11 | TLC Engineering for Architecture | 54,685,784 |
11 | — | John A. Martin & Associates | 53,821,300 |
12 | 15 | Clark, Richardson & Biskup Consulting Engineers | 53,688,000 |
13 | 17 | TMAD Taylor & Gaines | 51,030,000 |
14 | 16 | Schirmer Engineering Corp. | 49,483,833 |
15 | 20 | M-E Engineers | 44,700,000 |
16 | 19 | Rolf Jensen & Associates | 44,595,000 |
17 | 23 | Environmental Systems Design | 42,000,000 |
18 | 21 | Weidlinger Associates | 41,000,000 |
19 | 22 | Magnusson Klemencic Associates | 40,000,000 |
20 | 25 | Glumac | 35,500,000 |
21 | 41 | Mazzetti Nash Lipsey Burch | 32,500,000 |
22 | 26 | RDK Engineers | 32,000,000 |
23 | — | Degenkolb Engineers | 31,124,000 |
24 | 33 | KCI Technologies | 28,300,000 |
25 | 12 | X-nth | 27,095,370 |
26 | 27 | Interface Engineering | 26,624,398 |
27 | 9 | Birdsall Services Group | 26,350,000 |
28 | 29 | Coffman Engineers | 26,259,000 |
29 | 28 | Sparling | 26,250,000 |
30 | 30 | M/E Engineering | 25,735,000 |
31 | 44 | Newcomb & Boyd | 25,577,207 |
32 | 32 | H.F. Lenz Co. | 24,000,000 |
33 | 42 | Heapy Engineering | 21,573,000 |
34 | 31 | Henneman Engineering | 21,083,000 |
35 | 37 | GHT Limited | 19,600,000 |
36 | 43 | Rutherford & Chekene | 17,236,000 |
37 | 38 | Joseph R. Loring & Associates | 16,800,000 |
38 | 35 | Lilker Associates Consulting Engineers | 16,000,000 |
39 | 46 | Bridgers & Paxton Consulting Engineers | 15,341,792 |
40 | 36 | Wallace Engineering | 15,070,000 |
41 | — | Dunham Associates | 14,500,000 |
42 | 47 | Peter Basso Associates | 14,300,000 |
43 | 40 | KTA Group | 13,800,000 |
44 | — | Brinjac Engineer | 12,540,000 |
45 | 50 | James Posey Associates | 12,200,000 |
46 | 49 | CB Engineers | 10,410,000 |
47 | 45 | Bala Consulting Engineers | 10,200,000 |
48 | 48 | Wick Fisher White Engineers | 10,000,000 |
49 | 51 | RMH Group, The | 9,848,715 |
50 | — | KLH Engineers | 9,595,932 |
51 | — | Allen & Shariff Corp. | 9,500,000 |
Related Stories
| Jan 19, 2011
Industrial history museum gets new home in steel plant
The National Museum of Industrial History recently renovated the exterior of a 1913 steel plant in Bethlehem, Pa., to house its new 40,000-sf exhibition space. The museum chose VOA Associates, which is headquartered in Chicago, to complete the design for the exhibit’s interior. The exhibit, which has views of five historic blast furnaces, will feature artifacts from the Smithsonian Institution to illustrate early industrial America.
| Jan 19, 2011
San Diego casino renovations upgrade gaming and entertainment
The Sycuan Casino in San Diego will get an update with a $27 million, 245,000-sf renovation. Hnedak Bobo Group, Memphis, Tenn., and Cleo Design, Las Vegas, drew design inspiration from the historic culture of the Sycuan tribe and the desert landscape, creating a more open space with better circulation. Renovation highlights include a new “waterless” water entry feature and new sports bar and grill, plus updates to gaming, poker, off-track-betting, retail, and bingo areas. The local office of San Francisco-based Swinerton Builders will provide construction services.
| Jan 19, 2011
New Fort Hood hospital will replace aging medical center
The Army Corps of Engineers selected London-based Balfour Beatty and St. Louis-based McCarthy to provide design-build services for the Fort Hood Replacement Hospital in Texas, a $503 million, 944,000-sf complex partially funded by the American Recovery and Reinvestment Act. The firm plans to use BIM for the project, which will include outpatient clinics, an ambulance garage, a central utility plant, and three parking structures. Texas firms HKS Architects and Wingler & Sharp will participate as design partners. The project seeks LEED Gold.
| Jan 19, 2011
Museum design integrates Greek history and architecture
Construction is under way in Chicago on the National Hellenic Museum, the nation’s first museum devoted to Greek history and culture. RTKL designed the 40,000-sf limestone and glass building to include such historic references as the covered walkway of classical architecture and the natural wood accents of Byzantine monasteries. The museum will include a research library and oral history center, plus a 3,600-sf rooftop terrace featuring three gardens. The project seeks LEED Silver.
| Jan 4, 2011
An official bargain, White House loses $79 million in property value
One of the most famous office buildings in the world—and the official the residence of the President of the United States—is now worth only $251.6 million. At the top of the housing boom, the 132-room complex was valued at $331.5 million (still sounds like a bargain), according to Zillow, the online real estate marketplace. That reflects a decline in property value of about 24%.
| Jan 4, 2011
Luxury hotel planned for Palace of Versailles
Want to spend the night at the Palace of Versailles? The Hotel du Grand Controle, a 1680s mansion built on palace grounds for the king's treasurer and vacant since the French Revolution, will soon be turned into a luxury hotel. Versailles is partnering with Belgian hotel company Ivy International to restore the dilapidated estate into a 23-room luxury hotel. Guests can live like a king or queen for a while—and keep their heads.
| Dec 17, 2010
Sam Houston State arts programs expand into new performance center
Theater, music, and dance programs at Sam Houston State University have a new venue in the 101,945-sf, $38.5 million James and Nancy Gaertner Performing Arts Center. WHR Architects, Houston, designed the new center to connect two existing buildings at the Huntsville, Texas, campus.
| Dec 17, 2010
Subway entrance designed to exude Hollywood charm
The Hollywood/Vine Metro portal and public plaza in Los Angeles provides an entrance to the Red Line subway and the W Hollywood Hotel. Local architect Rios Clementi Hale Studio designed the portal and plaza to flow with the landmark theaters and plazas that surround it.
| Dec 17, 2010
Toronto church converted for condos and shopping
Reserve Properties is transforming a 20th-century church into Bellefair Kew Beach Residences, a residential/retail complex in The Beach neighborhood of Toronto. Local architecture firm RAWdesign adapted the late Gothic-style church into a five-story condominium with 23 one- and two-bedroom units, including two-story penthouse suites. Six three-story townhouses also will be incorporated. The project will afford residents views of nearby Kew Gardens and Lake Ontario. One façade of the church was updated for retail shops.
| Nov 23, 2010
The George W. Bush Presidential Center, which will house the former president’s library
The George W. Bush Presidential Center, which will house the former president’s library and museum, plus the Bush Institute, is aiming for LEED Platinum. The 226,565-sf center, located at Southern Methodist University, in Dallas, was designed by architect Robert A.M. Stern and landscape architect Michael Van Valkenburgh.