Project: Medical Education Building, Emory School of Medicine, AtlantaArchitect: The S/L/A/M Collaborative (AE 31)Structural engineer: KSI Structural EngineersMEP engineer: Newcomb & Boyd (E 31)General contractor: The Whiting-Turner Contracting Co. (C 7)Photo: Courtesy The S/L/A/M Collaborative |
University construction spending is 13% higher than a year ago—mostly for residence halls and infrastructure on public campuses—and is expected to slip less than 5% over the next two years. However, the value of starts dropped about 10% in recent months and will not return to the 2007–08 peak for about two years.
Company | Billings ($) | |
Source: 2009 Giants 300 survey. For expanded university design rankings, visit: www.BDCnetwork.com/Giants | ||
1 | Burt Hill | 81,834,000 |
2 | HOK | 75,200,000 |
3 | AECOM Technology Corp. | 63,529,000 |
4 | Cannon Design | 51,084,000 |
5 | Perkins+Will | 48,000,000 |
6 | Gensler | 37,215,000 |
7 | SmithGroup | 36,948,750 |
8 | HDR Architecture | 33,940,000 |
9 | Arup | 33,000,000 |
10 | RMJM | 32,497,392 |
11 | Sasaki Associates | 30,950,000 |
12 | Ellerbe Becket | 28,299,184 |
13 | Dewberry | 28,270,000 |
14 | Jacobs | 27,144,560 |
15 | Affiliated Engineers | 27,132,120 |
16 | EYP Architecture & Engineering | 25,500,000 |
17 | Parsons Brinckerhoff | 25,098,000 |
18 | Stantec | 24,596,000 |
19 | URS Corp. | 21,000,000 |
20 | R.G. Vanderweil Engineers | 20,393,105 |
Company | Value put in place ($) | |
Source: 2009 Giants 300 survey. For expanded university contractor rankings, visit: www.BDCnetwork.com/Giants | ||
1 | Turner | 1,150,600,000 |
2 | Gilbane Building Co. | 703,599,820 |
3 | Whiting-Turner Contracting Co. | 492,258,678 |
4 | Structure Tone | 454,141,500 |
5 | Skanska USA Building | 427,071,221 |
6 | Swinerton Inc. | 299,360,000 |
7 | Webcor Builders | 293,807,692 |
8 | PCL Construction Enterprises | 288,471,629 |
9 | McCarthy Holdings | 277,101,000 |
10 | Flintco Cos., The | 254,428,800 |
11 | JE Dunn Construction Group | 248,391,000 |
12 | Mortenson Construction | 226,008,000 |
13 | Hoffman Construction | 224,000,000 |
14 | Bovis Lend Lease | 212,903,379 |
15 | Clark Group | 210,050,000 |
16 | Austin Industries | 208,199,672 |
17 | Hensel Phelps Construction | 200,220,000 |
18 | C.W. Driver | 177,710,764 |
19 | Hunt Construction Group | 175,000,000 |
20 | DPR Construction | 165,245,490 |
2009 | 2008 | Company | 2008 Billings ($) |
Rank | |||
Source: 2009 Giants 300 survey. For expanded Engineering Firmrankings, visit: www.BDCnetwork.com/Giants | |||
1 | 4 | Syska Hennessy Group | 115,600,000 |
2 | 2 | Fluor Corp. | 114,470,000 |
3 | 3 | KPFF Consulting Engineers | 81,000,000 |
4 | 6 | Affiliated Engineers | 75,367,000 |
5 | 5 | Smith Seckman Reid | 68,260,000 |
6 | 10 | Walter P Moore | 64,572,266 |
7 | 18 | Henderson Engineers | 58,350,590 |
8 | 14 | KJWW Engineering Consultants | 58,265,636 |
9 | 8 | R.G. Vanderweil Engineers | 55,116,500 |
10 | 11 | TLC Engineering for Architecture | 54,685,784 |
11 | — | John A. Martin & Associates | 53,821,300 |
12 | 15 | Clark, Richardson & Biskup Consulting Engineers | 53,688,000 |
13 | 17 | TMAD Taylor & Gaines | 51,030,000 |
14 | 16 | Schirmer Engineering Corp. | 49,483,833 |
15 | 20 | M-E Engineers | 44,700,000 |
16 | 19 | Rolf Jensen & Associates | 44,595,000 |
17 | 23 | Environmental Systems Design | 42,000,000 |
18 | 21 | Weidlinger Associates | 41,000,000 |
19 | 22 | Magnusson Klemencic Associates | 40,000,000 |
20 | 25 | Glumac | 35,500,000 |
21 | 41 | Mazzetti Nash Lipsey Burch | 32,500,000 |
22 | 26 | RDK Engineers | 32,000,000 |
23 | — | Degenkolb Engineers | 31,124,000 |
24 | 33 | KCI Technologies | 28,300,000 |
25 | 12 | X-nth | 27,095,370 |
26 | 27 | Interface Engineering | 26,624,398 |
27 | 9 | Birdsall Services Group | 26,350,000 |
28 | 29 | Coffman Engineers | 26,259,000 |
29 | 28 | Sparling | 26,250,000 |
30 | 30 | M/E Engineering | 25,735,000 |
31 | 44 | Newcomb & Boyd | 25,577,207 |
32 | 32 | H.F. Lenz Co. | 24,000,000 |
33 | 42 | Heapy Engineering | 21,573,000 |
34 | 31 | Henneman Engineering | 21,083,000 |
35 | 37 | GHT Limited | 19,600,000 |
36 | 43 | Rutherford & Chekene | 17,236,000 |
37 | 38 | Joseph R. Loring & Associates | 16,800,000 |
38 | 35 | Lilker Associates Consulting Engineers | 16,000,000 |
39 | 46 | Bridgers & Paxton Consulting Engineers | 15,341,792 |
40 | 36 | Wallace Engineering | 15,070,000 |
41 | — | Dunham Associates | 14,500,000 |
42 | 47 | Peter Basso Associates | 14,300,000 |
43 | 40 | KTA Group | 13,800,000 |
44 | — | Brinjac Engineer | 12,540,000 |
45 | 50 | James Posey Associates | 12,200,000 |
46 | 49 | CB Engineers | 10,410,000 |
47 | 45 | Bala Consulting Engineers | 10,200,000 |
48 | 48 | Wick Fisher White Engineers | 10,000,000 |
49 | 51 | RMH Group, The | 9,848,715 |
50 | — | KLH Engineers | 9,595,932 |
51 | — | Allen & Shariff Corp. | 9,500,000 |
Related Stories
| Apr 9, 2014
Steel decks: 11 tips for their proper use | BD+C
Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.
| Apr 8, 2014
Gehry, Foster unveil plans for Battersea Power Station redevelopment [slideshow]
Phase 3 of the massive redevelopment of the London landmark will include more than 1,300 residential units, a 160-room hotel, and 350,000 sf of retail space.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Mar 26, 2014
Callison launches sustainable design tool with 84 proven strategies
Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com.
| Mar 26, 2014
Zaha Hadid's glimmering 'cultural hub of Seoul' opens with fashion, flair [slideshow]
The new space, the Dongdaemun Design Plaza, is a blend of park and cultural spaces meant for the public to enjoy.
| Mar 25, 2014
Sydney breaks ground on its version of the High Line elevated park [slideshow]
The 500-meter-long park will feature bike paths, study pods, and outdoor workspaces.
Sponsored | | Mar 21, 2014
Kameleon Color paint creates color-changing, iridescent exterior for Exploration Tower at Port Canaveral
Linetec finishes Firestone’s UNA-CLAD panels, achieving a one-of-a-kind, dynamic appearance with the first use of Valspar’s new Kameleon Color
| Mar 20, 2014
Common EIFS failures, and how to prevent them
Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems.
| Mar 13, 2014
Do you really 'always turn right'?
The first visitor center we designed was the Ernest F. Coe Visitor Center for the Everglades National Park in 1993. I remember it well for a variety of reasons, not the least of which was the ongoing dialogue we had with our retail consultant. He insisted that the gift shop be located on the right as one exited the visitor center because people “always turn right.”
| Mar 12, 2014
14 new ideas for doors and door hardware
From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations.