To mark the 25th anniversary of the Berlin Wall’s fall, LED-lit balloons will line the wall’s former span, between Oberbaumbrücke and Bornholm Road, The Creators Project reports.
The balloons will be up for two days and two nights, starting November 7.
The project, named Lichtgrenze (or Border of Light), makes for a colossal art installation that will span 10 miles, dividing Berlin back to East and West. There will be 8,000 LED light-filled balloons, each 11 feet high and with 24-inch-diameter orbs, lining the path.
Researchers at the University of Hannover were asked to help design the balloons to be biodegradable. The material will decompose by natural environment factors such as sunlight, oxygen, and bacteria.
The idea for the installation was conceived by light artist and designer Christopher Bauder and his brother, filmmaker Marc Bauder.
Along key locations of the trail will be 30-foot-tall video screens that will play historical footage of the Wall, which Marc Bauder plans to use to juxtapose divided Berlin with the city today.
On the last day, November 9, at 7 pm—the anniversary of the fall of the Wall—patrons can attach personal notes to the balloons and then discconect them, allowing the helium-filled orbs to float into the Berlin night sky. LEDs integrated into the stands, powered by 60,000 batteries, will illuminate the orbs as they take off.
Stay tuned for more updates of the event at The Creators Project.
Â
Related Stories
| Nov 6, 2012
Simpson Strong-Tie donates $25K to hurricane support
The company will also be matching employees’ personal contributions to the Red Cross and other nonprofit disaster relief organizations.
| Nov 6, 2012
Goettsch Partners designs new tower in Shunde, China
200-meter-tall building will be located between Guangzhou and Hong Kong.
| Nov 5, 2012
Brasfield & Gorrie awarded new steel processing facility for Kloeckner Metals
The construction will take place on a 16-acre greenfield site at ThyssenKrupp Industrial Park in Calvert.
| Nov 5, 2012
Trimble acquires Vico assets, extends design-build-operate capabilities
Software to add 5D management to Trimble’s Solutions for vertical construction contractors.
| Oct 30, 2012
Lord, Aeck & Sargent announces four student life facility wins
Projects recognize the architecture firm’s expertise on a nationwide basis.
| Oct 30, 2012
The Beck Group announces CEO succession plan
Current Eastern Division Director and company veteran, Fred Perpall, named CEO.
| Oct 30, 2012
Two-hour fire rated curtain wall passes CDC tests
CDC (Curtain Wall Design and Consulting) is an independent firm providing a wide range of building envelope design, engineering, and consulting services to design professionals nationwide.
| Oct 30, 2012
Wight & Company announces three hires
Expands team and adds staff to work on the UNO project.
| Oct 15, 2012
Silicones from Dow Corning solve high-altitude technical challenges at the world’s tallest tower
The spectacular Burj Khalifa skyscraper soars to 828m above ground level, holding the record for being the world’s tallest building and also for the highest installation of an aluminum and glass façade. To take on its numerous challenges and technical difficulties, it required proven silicone solutions and full support from Dow Corning.
| Oct 15, 2012
Three new members elected to AISC Board of Directors
New members will immediately begin serving on the AISC Board of Directors, assisting with the organization's planning and leadership in the steel construction industry.