To mark the 25th anniversary of the Berlin Wall’s fall, LED-lit balloons will line the wall’s former span, between Oberbaumbrücke and Bornholm Road, The Creators Project reports.
The balloons will be up for two days and two nights, starting November 7.
The project, named Lichtgrenze (or Border of Light), makes for a colossal art installation that will span 10 miles, dividing Berlin back to East and West. There will be 8,000 LED light-filled balloons, each 11 feet high and with 24-inch-diameter orbs, lining the path.
Researchers at the University of Hannover were asked to help design the balloons to be biodegradable. The material will decompose by natural environment factors such as sunlight, oxygen, and bacteria.
The idea for the installation was conceived by light artist and designer Christopher Bauder and his brother, filmmaker Marc Bauder.
Along key locations of the trail will be 30-foot-tall video screens that will play historical footage of the Wall, which Marc Bauder plans to use to juxtapose divided Berlin with the city today.
On the last day, November 9, at 7 pm—the anniversary of the fall of the Wall—patrons can attach personal notes to the balloons and then discconect them, allowing the helium-filled orbs to float into the Berlin night sky. LEDs integrated into the stands, powered by 60,000 batteries, will illuminate the orbs as they take off.
Stay tuned for more updates of the event at The Creators Project.
Related Stories
| Dec 7, 2012
Structural glazing sealant protects solar-rooftop stadium in Taiwan
Designers of the Kaohsiung World Games Main Stadium in Gaoxiong, Taiwan, powered by almost 9,000 rooftop solar panels, required an effective panel fixing design offering optimum energy transfer rate, plus thermal and weathertight performance. Dow Corning specialists recommended a four-sided structural sealant solution featuring Dow Corning 983 Structural Glazing Sealant.
| Dec 6, 2012
Ziegler Cooper names Soto as Director of Design, Broadens Design Capabilities
Soto will oversee design efforts, bringing a high level of quality and problem solving capabilities through active engagement with clients and studios firm wide.
| Dec 5, 2012
Gilbane publishes Winter 2012 construction economic report
Report outlines impact of recent events; predicts continued movement, while slow, toward recovery.
| Dec 5, 2012
Gehry-designed New York City tower receives Emporis Skyscraper Award
8 Spruce Street is now the third New York tower to win the Emporis Skyscraper Award.
| Dec 4, 2012
MKK’s Denver Human Services Eastside Building wins ACEC Excellence Award
MKK provided mechanical, plumbing and fire protection consulting services on this LEED-NC Gold project.
| Dec 4, 2012
Thornton Tomasetti opens new office in São Paulo, Brazil
The move to São Paulo is strategic and timely, as the country continues preparations for the 2014 World Cup and 2016 Olympic Games in Rio de Janeiro.
| Dec 4, 2012
Greenhorne & O’Mara signs letter of intent to join Stantec
Acquisitions of C3TS and Architecture 2000 also completed.
| Dec 4, 2012
Sto Corp. announces new distributor in the Carolinas
Company will now have coverage in several parts of North Carolina.
| Dec 4, 2012
Wirtz Beverage Illinois’ corporate headquarters completed
WBI Center, a new state-of-the-art facility, is designed by Ware Malcomb.
| Dec 4, 2012
Wagner joins Ghafari as Manager of Structural Engineering
Wagner comes to Ghafari from Walter P Moore, where he served as a principal, chaired the construction administration task force and led the design of numerous projects ranging in size from $10 million to $70 million.