flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Georgia Southern’s new $60 million Engineering and Research Building completes

University Buildings

Georgia Southern’s new $60 million Engineering and Research Building completes

The facility will serve as the new epicenter for engineering excellence and innovation in southeast Georgia.


By David Malone, Associate Editor | June 1, 2021
Georgia Southern Research and Engineering Building exterior

Photos Courtesy JE Dunn

Georgia Southern’s new $60 million, 140,625-sf Engineering and Research Building has completed construction. The building was designed to facilitate academic and institutional partnerships, inspire creative engineering, and accelerate academic success for students in the College of Engineering and Computing.

The new facility centralizes various departments and multiple disciplines whose activities previously took place in three buildings. The building will enhance the university’s research capabilities as well as opportunities for faculty to engage students in hands-on research and teaching projects.

Applied research spaces with a strong focus on manufacturing engineering, civil engineering, electrical and computer engineering, and mechanical engineering are all housed in the three-story building. Workspaces can be easily reconfigured for various uses, projects, and applications while also providing students with access to industry-grade equipment and expanded opportunities for undergraduate research.

 

Georgia Southern High Bay overlook interior

 

In total the building houses more than 35 labs including robotics and automated manufacturing labs, a traditional and CNC finishing lab, a materials science and characterization lab, an industrial instrumentation and controls lab, a joining and welding lab, and a renewable energy roof deck lab (solar, wind, weather). Metal and non-metal 3D-printing spaces are also included.

The building also includes one of the Southeast’s only Class 3 cleanrooms, which is necessary for manufacturing or scientific research that requires and environment with very low levels of pollutants such as dust, microbes, vapors, or aerosol particles.

21 research spaces, six classrooms, four conference rooms, 27 offices, and a 1,500-sf colloquium space with a 500-sf balcony are also included.

SmithGroup was the project architect. JE Dunn Construction built the facility.

Related Stories

Wood | May 14, 2021

What's next for mass timber design?

An architect who has worked on some of the nation's largest and most significant mass timber construction projects shares his thoughts on the latest design trends and innovations in mass timber.

University Buildings | May 13, 2021

Education Building II at UC Riverside receives final approval

Hensel Phelps + CO Architects will be the design-build team for the project.

Healthcare Facilities | May 5, 2021

HOK to design new Waterloo Eye Institute

The project is being designed for The University of Waterloo’s School of Optometry & Vision Science.

University Buildings | May 4, 2021

UMass Medical School’s new Education and Research Building

ZGF and ARC/Architectural Resources Cambridge are designing the project.

University Buildings | Apr 29, 2021

Perkins&Will to design new gateway building for the University of British Columbia

The building will transform the arrival experience for students, staff, and visitors.

University Buildings | Apr 29, 2021

The Weekly Show, April 29, 2021: COVID-19's impact on campus planning, and bird management strategies

This week on The Weekly show, BD+C Senior Editor John Caulfield interviews a duo of industry experts on 1) how campus planning has changed during the pandemic and 2) managing bird infestations on construction sites and completed buildings.

University Buildings | Apr 19, 2021

Duke University’s Wilkinson Building completes

Bohlin Cywinski Jackson designed the project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021