flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GE launches electric vehicle charging platform

GE launches electric vehicle charging platform

WattStation Connect provides owners a user-friendly method to manage, monitor and maintain their EV charging ecosystem network.


By By BD+C Staff | April 27, 2012
GEs WattStation pedestal EV charger is easy to use, customizable and features a
GEs WattStation pedestal EV charger is easy to use, customizable and features a retractable cord.

GE Energy’s Industrial Solutions business unveiled its new ecomagination-approved WattStation and WattStation Connect.

An electric vehicle (EV) charging station and software platform, the solution allows WattStation owners to manage charging stations remotely, giving them the ability to manage and set customer pricing for EV charging, provide access control at their facilities, generate valuable reports and engage with customers in new ways.

Now available, GE’s WattStation pedestal EV charger is easy to use, customizable and features a retractable cord.

The WattStation Connect full-service software platform helps meet a wide variety of EV needs, whether it is a retailer looking to attract new customers, a commercial property manager in need of information on electricity usage or a fleet owner in search of better cost-allocation data. WattStation Connect provides owners a user-friendly method to manage, monitor and maintain their EV charging ecosystem network.

Industrial Solutions is forming data acquisition agreements with key navigation companies to share information on the installations and availability of WattStations throughout the U.S. and Canada. This enables EV drivers to view and locate GE’s WattStations, obtain directions to the EV charging stations, access pricing details and determine whether a unit is available for charging. In addition to global positioning systems, the GE WattStation Connect data will be available through the Internet, mobile app/device and future in-vehicle systems.

GE Energy’s Industrial Solutions business is working with a well-known online payment company to enable drivers to safely and conveniently pay for charging fees through the WattStation Connect mobile app. The app will be available for download in the coming weeks. EV drivers can use the mobile app to scan the quick response (QR) barcode on the WattStation charger. The QR code will identify the station and the pricing structure for that individual charger. BD+C

Related Stories

| Aug 11, 2010

Gensler, HOK, HDR among the nation's leading reconstruction design firms, according to BD+C's Giants 300 report

A ranking of the Top 100 Reconstruction Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Gensler, Arup, HOK among the largest office sector design firms

A ranking of the Top 100 Office Design firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Callison strengthens retail design presence with RYA acquisition

Callison LLC on June 1 acquired RYA Design Consultancy, a Dallas-based retail architecture and design firm with offices in New York City. The new “Callison RYA Studio” will merge staff and clients into Callison ’s existing retail practice at their Dallas and New York offices.

| Aug 11, 2010

RSMeans/RCD forecast 14% drop in hospital construction for 2009

RSMeans forecasts a 14% drop in hospital construction in 2009 compared to 2008, with $17.1 billion in registered hospital projects as of June 30, 2009. The Reed Construction Data unit finds renovation of healthcare facilities increasing, from 36% of projects in 2008, to 40% of projects in the pipeline in the first six months of 2009.

| Aug 11, 2010

Prism-shaped design unveiled for five-star hotel in Saudi Arabia

Goettsch Partners has been commissioned by Saudi Oger Ltd. to design a new five-star, 214-key business hotel in the King Abdullah Financial District in Riyadh, Saudi Arabia. As a design-build assignment, Saudi Oger is serving as the contractor, selected by developer Rayadah Investment Company. The project is sited on Parcel 1.08, one of the first 10 parcels currently under development in the massive new master-planned district.

| Aug 11, 2010

Data center construction costs are down, according to a study by Environmental Systems Design

The current economic crisis has an up-side for owners of mission-critical facilities: On average, it costs less today to construct a new data center than it did in late 2007, according to a study by Environmental Systems Design (ESD). ESD found that the prices of feeder and cable have dropped by more than half, major data center equipment by 12%, labor and materials by 19.6%, and shipping and handling by 15% from the fourth quarter of 2007 to July 15, 2009.

| Aug 11, 2010

Construction Specifications Institute to end support of MasterFormat 95 on December 31, 2009

The Construction Specifications Institute (CSI) announced that the organization will cease to license and support MasterFormat 95 as of December 31, 2009. The CSI Board of Directors voted to stop licensing and supporting MasterFormat 95 during its June 16, 2009, meeting at the CSI Annual Convention in Indianapolis.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021