Nearly 100 years after Antoni Gaudí’s death, Chile will begin constructing a chapel using his original designs for the rear section of Sagrada Família’s apse, Dezeen reports.
Slated for completion in 2017, the chapel in Chile will be the Spanish architect’s first building outside of his home country. The chapel is also expected to be completed before La Sagrada Família, one of Gaudí’s most iconic works yet to be completed.
According to Fast Company, the chapel will be named Our Lady of the Angels Chapel, and will be located in the city of Rancagua, 50 miles south of Santiago. Construction will be overseen by project architect Christian Matzner, and will cost $7 million in government funding.
The 98-foot-tall structure will be adorned with 20 oculi carved from stone in Barcelona. Lapis lazuli mined in Chile will cover the main tower, topped with a copper cross. A crypt will house the remains of friar Angélico Aranda, who wrote Gaudí a letter in 1922 asking him to design a chapel for Rancagua.
“I wish to build something original–very original–and I thought of you,” Aranda wrote in his letter, adding that he wants designs for a chapel “only as you know how to do.”
Read more on Dezeen.
Related Stories
| Oct 27, 2011
iProspect selects VLK Architects for new office design
Company growth prompted iProspect to make the decision to move to a new space.
| Oct 27, 2011
ASSA Abloy, MAXXESS Systems announce U.S. Aperio integration
Aperio will integrate with MAXXESS's eAXxess and Efusion Event Management Software packages.
| Oct 26, 2011
Metl-Span selected for re-roof project
School remained in session during the renovation and it was important to minimize the disruption as much as possible.
| Oct 26, 2011
Shawmut Design and Construction awarded Tag Heuer build in Aventura, Fla.
New store features 1,200 sf fit out at Aventura Mall.
| Oct 25, 2011
HKS Science & Technology practice formed
Specializing in the planning and design of highly technical building types, HKS’s Science & Technology practice offers the broadest range of services available to the academic and biomedical research, biotechnology, pharmaceutical and medical device community, including laboratory programming, planning and design, strategic science planning and laboratory equipment planning.
| Oct 25, 2011
Universal teams up with Earthbound Corp. to provide streamlined commercial framing solutions
The primary market for the Intact Structural Frame is light commercial buildings that are typically designed with concrete masonry walls, steel joists and steel decks.
| Oct 25, 2011
Ritner Steel CEO elected to AISC Board
Freund will begin serving on the AISC board of directors, assisting with the organization's planning and leadership in the steel construction industry.
| Oct 25, 2011
Commitment to green building practices pays off
The study, conducted by the Pacific Northwest National Laboratory, built on a good indication of the potential for increased productivity and performance pilot research completed two years ago, with similarly impressive results.