Nearly 100 years after Antoni Gaudí’s death, Chile will begin constructing a chapel using his original designs for the rear section of Sagrada Família’s apse, Dezeen reports.
Slated for completion in 2017, the chapel in Chile will be the Spanish architect’s first building outside of his home country. The chapel is also expected to be completed before La Sagrada Família, one of Gaudí’s most iconic works yet to be completed.
According to Fast Company, the chapel will be named Our Lady of the Angels Chapel, and will be located in the city of Rancagua, 50 miles south of Santiago. Construction will be overseen by project architect Christian Matzner, and will cost $7 million in government funding.
The 98-foot-tall structure will be adorned with 20 oculi carved from stone in Barcelona. Lapis lazuli mined in Chile will cover the main tower, topped with a copper cross. A crypt will house the remains of friar Angélico Aranda, who wrote Gaudí a letter in 1922 asking him to design a chapel for Rancagua.
“I wish to build something original–very original–and I thought of you,” Aranda wrote in his letter, adding that he wants designs for a chapel “only as you know how to do.”
Read more on Dezeen.
Related Stories
| Nov 10, 2011
Grousbeck Center for Students & Technology opens doors
New Perkins School for the Blind Building is dedicated to innovation, interaction, and independence for students.
| Nov 10, 2011
Skanska Moss to expand and renovate Greenville-Spartanburg International Airport
The multi-phase terminal improvement program consists of an overall expansion to the airport’s footprint and major renovations to the existing airport terminal.
| Nov 10, 2011
Suffolk Construction awarded MBTA transit facility and streetscape project
The 21,000-sf project will feature construction of a cable-stayed pedestrian bridge over Ocean Avenue, an elevated plaza deck above Wonderland MBTA Station, a central plaza, and an at-grade pedestrian crossing over Revere Beach Boulevard
| Nov 10, 2011
Thornton Tomasetti’s Joseph and Choi to co-chair the Council on Tall Buildings and Urban Habitat’s Outrigger Design Working Group
Design guide will describe in detail the application of outriggers within the lateral load resisting systems of tall buildings, effects on building behavior and recommendations for design.
| Nov 9, 2011
Lincoln Center Pavilion wins national architecture and engineering award
The project team members include owner Lincoln Center for the Performing Arts, New York; design architect and interior designer of the restaurant, Diller Scofidio + Renfro, New York; executive architect, FXFOWLE, New York; and architect and interior designer of the film center, Rockwell Group, New York; structural engineer Arup (AISC Member), New York; and general contractor Turner Construction Company (AISC Member), New York.
| Nov 9, 2011
Sika Sarnafil Roof Recycling Program recognized by Society of Plastics Engineers
Program leads the industry in recovering and recycling roofing membrane into new roofing products.
| Nov 9, 2011
American Standard Brands joins the Hospitality Sustainable Purchasing Consortium
American Standard will collaborate with other organizations to build an industry-wide sustainability performance index.
| Nov 8, 2011
Transforming a landmark coastal resort
Originally built in 1973, the building had received several alterations over the years but the progressive deterioration caused by the harsh salt water environment had never been addressed.