flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

FMI releases Adjust, Adapt, Act Study

FMI releases Adjust, Adapt, Act Study


By By BD+C Staff | October 24, 2011
The article also summarizes thoughts and insight from senior FMI strategy experts on success strategies that have become crucial

FMI, the largest provider of management consulting and investment banking to the engineering and construction industry, releases its newest study "Adjust, Adapt, Act: Winning Stories From the Post-2007 Construction Industry."

The paper explores several case studies, including Sun Country Builders, Huen, BakerTriangle, Consigli, Skender Construction and Flatiron, and distills the key factors that make these companies unique and successful. The article also summarizes thoughts and insight from senior FMI strategy experts on success strategies that have become crucial in running a profitable construction business, as well as common mistakes, which can lead to failure in today's cutthroat environment.

Select success strategies discussed in the paper include:

  • Get into the heads of your clients – early
  • Reinvent yourself and innovate. Find what makes you unique
  • Be smart about diversifying your portfolio
  • Be nimble and flexible, yet disciplined. Never get complacent
  • Understand "incremental economics" – revenue, margin, overhead – more than ever
  • Bring creative financing solutions to the table
  • Build contingency plans into all corporate strategy discussions and never stop looking ahead.

Key highlights include:

  • Case studies on successful companies
  • Business imperatives for a volatile economy – thoughts and insight from FMI consultants and study participants
  • Common mistakes – summary of most frequent strategic mistakes witnessed by FMI consultants
  • Conclusion and recommendations

To download a copy of the full report, click here. For reprint permission or to schedule an interview with the author, please contact Sarah Vizard at 919.785.9221. BD+C

Related Stories

| May 18, 2011

Eco-friendly San Antonio school combines history and sustainability

The 113,000-sf Rolling Meadows Elementary School in San Antonio is the Judson Independent School District’s first sustainable facility, with green features such as vented roofs for rainwater collection and regionally sourced materials.

| May 18, 2011

New Reform Jewish Independent school opens outside Boston

The Rashi School, one of only 17 Reform Jewish independent schools in North American and Israel, opened a new $30 million facility on a 166-acre campus shared with the Hebrew SeniorLife community on the Charles River in Dedham, Mass.

| May 18, 2011

Design diversity celebrated at Orange County club

The Orange County, Calif., firm NKDDI designed the 22,000-sf Luna Lounge & Nightclub in Pomona, Calif., to be a high-end multipurpose event space that can transition from restaurant to lounge to nightclub to music venue.

| May 18, 2011

Lab personnel find comfort in former Winchester gun factory

The former Winchester Repeating Arms Factory in New Haven, Conn., is the new home of PepsiCo’s Biology Innovation Research Laboratory.

| May 18, 2011

Addition provides new school for pre-K and special-needs kids outside Chicago

Perkins+Will, Chicago, designed the Early Learning Center, a $9 million, 37,000-sf addition to Barrington Middle School in Barrington, Ill., to create an easily accessible and safe learning environment for pre-kindergarten and special-needs students.

| May 18, 2011

Raphael Viñoly’s serpentine-shaped building snakes up San Francisco hillside

The hillside location for the Ray and Dagmar Dolby Regeneration Medicine building at the University of California, San Francisco, presented a challenge to the Building Team of Raphael Viñoly, SmithGroup, DPR Construction, and Forell/Elsesser Engineers. The 660-foot-long serpentine-shaped building sits on a structural framework 40 to 70 feet off the ground to accommodate the hillside’s steep 60-degree slope.

| May 18, 2011

New center provides home to medical specialties

Construction has begun on the 150,000-sf Medical Arts Pavilion at the University Medical Center in Princeton, N.J.

| May 18, 2011

Improvements add to Detroit convention center’s appeal

Interior and exterior renovations and updates will make the Detroit Cobo Center more appealing to conventioneers. A new 40,000-sf ballroom will take advantage of the center’s riverfront location, with views of the river and downtown.

| May 18, 2011

One of Delaware’s largest high schools seeks LEED for Schools designation

The $82 million, 280,000-sf Dover (Del.) High School will have capacity for 1,800 students and feature a 900-seat theater, a 2,500-seat gymnasium, and a 5,000-seat football stadium.

boombox1
boombox2
native1

More In Category


Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021