flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

FMI releases Adjust, Adapt, Act Study

FMI releases Adjust, Adapt, Act Study


By By BD+C Staff | October 24, 2011
The article also summarizes thoughts and insight from senior FMI strategy experts on success strategies that have become crucial

FMI, the largest provider of management consulting and investment banking to the engineering and construction industry, releases its newest study "Adjust, Adapt, Act: Winning Stories From the Post-2007 Construction Industry."

The paper explores several case studies, including Sun Country Builders, Huen, BakerTriangle, Consigli, Skender Construction and Flatiron, and distills the key factors that make these companies unique and successful. The article also summarizes thoughts and insight from senior FMI strategy experts on success strategies that have become crucial in running a profitable construction business, as well as common mistakes, which can lead to failure in today's cutthroat environment.

Select success strategies discussed in the paper include:

  • Get into the heads of your clients – early
  • Reinvent yourself and innovate. Find what makes you unique
  • Be smart about diversifying your portfolio
  • Be nimble and flexible, yet disciplined. Never get complacent
  • Understand "incremental economics" – revenue, margin, overhead – more than ever
  • Bring creative financing solutions to the table
  • Build contingency plans into all corporate strategy discussions and never stop looking ahead.

Key highlights include:

  • Case studies on successful companies
  • Business imperatives for a volatile economy – thoughts and insight from FMI consultants and study participants
  • Common mistakes – summary of most frequent strategic mistakes witnessed by FMI consultants
  • Conclusion and recommendations

To download a copy of the full report, click here. For reprint permission or to schedule an interview with the author, please contact Sarah Vizard at 919.785.9221. BD+C

Related Stories

| Nov 10, 2011

Grousbeck Center for Students & Technology opens doors

New Perkins School for the Blind Building is dedicated to innovation, interaction, and independence for students.

| Nov 10, 2011

Skanska Moss to expand and renovate Greenville-Spartanburg International Airport

The multi-phase terminal improvement program consists of an overall expansion to the airport’s footprint and major renovations to the existing airport terminal.

| Nov 10, 2011

Suffolk Construction awarded MBTA transit facility and streetscape project

The 21,000-sf project will feature construction of a cable-stayed pedestrian bridge over Ocean Avenue, an elevated plaza deck above Wonderland MBTA Station, a central plaza, and an at-grade pedestrian crossing over Revere Beach Boulevard

| Nov 10, 2011

Thornton Tomasetti’s Joseph and Choi to co-chair the Council on Tall Buildings and Urban Habitat’s Outrigger Design Working Group

Design guide will describe in detail the application of outriggers within the lateral load resisting systems of tall buildings, effects on building behavior and recommendations for design. 

| Nov 9, 2011

Lincoln Center Pavilion wins national architecture and engineering award

The project team members include owner Lincoln Center for the Performing Arts, New York; design architect and interior designer of the restaurant, Diller Scofidio + Renfro, New York; executive architect, FXFOWLE, New York; and architect and interior designer of the film center, Rockwell Group, New York; structural engineer Arup (AISC Member), New York; and general contractor Turner Construction Company (AISC Member), New York. 

| Nov 9, 2011

Sika Sarnafil Roof Recycling Program recognized by Society of Plastics Engineers

Program leads the industry in recovering and recycling roofing membrane into new roofing products.

| Nov 9, 2011

American Standard Brands joins the Hospitality Sustainable Purchasing Consortium

  American Standard will collaborate with other organizations to build an industry-wide sustainability performance index.

| Nov 8, 2011

Transforming a landmark coastal resort

Originally built in 1973, the building had received several alterations over the years but the progressive deterioration caused by the harsh salt water environment had never been addressed.

boombox1
boombox2
native1

More In Category


Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021