flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

FMI releases Adjust, Adapt, Act Study

FMI releases Adjust, Adapt, Act Study


By By BD+C Staff | October 24, 2011
The article also summarizes thoughts and insight from senior FMI strategy experts on success strategies that have become crucial

FMI, the largest provider of management consulting and investment banking to the engineering and construction industry, releases its newest study "Adjust, Adapt, Act: Winning Stories From the Post-2007 Construction Industry."

The paper explores several case studies, including Sun Country Builders, Huen, BakerTriangle, Consigli, Skender Construction and Flatiron, and distills the key factors that make these companies unique and successful. The article also summarizes thoughts and insight from senior FMI strategy experts on success strategies that have become crucial in running a profitable construction business, as well as common mistakes, which can lead to failure in today's cutthroat environment.

Select success strategies discussed in the paper include:

  • Get into the heads of your clients – early
  • Reinvent yourself and innovate. Find what makes you unique
  • Be smart about diversifying your portfolio
  • Be nimble and flexible, yet disciplined. Never get complacent
  • Understand "incremental economics" – revenue, margin, overhead – more than ever
  • Bring creative financing solutions to the table
  • Build contingency plans into all corporate strategy discussions and never stop looking ahead.

Key highlights include:

  • Case studies on successful companies
  • Business imperatives for a volatile economy – thoughts and insight from FMI consultants and study participants
  • Common mistakes – summary of most frequent strategic mistakes witnessed by FMI consultants
  • Conclusion and recommendations

To download a copy of the full report, click here. For reprint permission or to schedule an interview with the author, please contact Sarah Vizard at 919.785.9221. BD+C

Related Stories

| Nov 22, 2011

Saskatchewan's $1.24 billion carbon-capture project

The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.

| Nov 22, 2011

New Green Matters Conference examines emerging issues in concrete and sustainability

High-interest topics will be covered in technical seminars, including infrared reflective coatings for heat island mitigation, innovative uses of concrete to provide cooling and stormwater management, environmental benefits of polished concrete, and advancements in functional resilience of architectural concrete.

| Nov 22, 2011

Suffolk Construction selected as contractor for Boston luxury residential tower

Project team breaks ground on 488,000-sf building that will feature world-class amenities.

| Nov 22, 2011

Jones Lang LaSalle completes construction of two new stores in Manhattan

Firm creates new global design standard serving as project manager for Uniglo’s 89,000-sf flagship location and, 64,000-sf store.

| Nov 21, 2011

Mortenson and enXco partnership to build its 19th wind project

The 8,500 acres project will generate140 megawatts of wind power – enough energy to power approximately 39,000 homes.

| Nov 21, 2011

FDH Engineering acquires Energy Solutions

All ESI employees have been merged into FDH’s staff at its St. Louis office.

| Nov 18, 2011

Centre for Interactive Research on Sustainability opens

Designed to exceed LEED Platinum, the Centre for Interactive Research on Sustainability (CIRS) is one of the most innovative and high performance buildings in North America today, demonstrating leading-edge green building design products, technologies, and systems.

| Nov 17, 2011

SmithGroup changes name to SmithGroupJJR

SmithGroup and JJR join brands to become a single, multi-disciplinary company.

boombox1
boombox2
native1

More In Category


Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021