flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

FMI releases 2012 first quarter construction outlook

FMI releases 2012 first quarter construction outlook

The last time construction put in place was at this level was 2000-2001.


By By BD+C Staff | March 20, 2012

FMI released the first-quarter 2012 Construction Outlook Report forecasting a 5% increase in total construction put in place for 2012 compared to 2011, or $826.3 billion. The last time construction put in place was at this level was 2000-2001.

Despite slow growth projections and rising gasoline prices, the GDP is still growing and consumers are still spending, reflected in the Conference Board's Consumer Confidence Index increasing to 70.8 in February compared to 70.4 a year ago. Along with the Federal Reserve's intervention, these factors have served to keep growth slow and inflation in check.

In order for residential construction to achieve the 8 percent increase projected and top $264.4 billion in 2012, a number of factors still have to fall into place:

  • Reduction in the current inventory of homes
  • Lenders willing to lend on reasonable terms
  • Steady improvement in hiring

Projections indicate a 4% increase in nonresidential buildings for 2012, topping $341 billion, with slightly higher growth in 2013 to $361 billion. Nonresidential contractors are facing many of the same problems as residential contractors. In addition, competition is fierce, with low price still the name of the game. Project owners who are ready to restart their building programs are expecting hungry contractors to submit very low bids. One of the keys for growth will be the return of private investment in construction. Additionally, federal, state and local government construction have been dialed back until budgets are in better repair and tax revenues return to levels that are more normal. Research indicates that there are signs this is starting to happen. BD+C

Related Stories

| Mar 28, 2014

Crazy commuting: British artist wants to construct 300-foot water slide on city street

Bristol-based artist Luke Jerram hopes that the temporary installation, once funded, will encourage the public to think about "how we want to use the city, and what sort of future we want to see.”

| Mar 27, 2014

Develop strategic thinkers throughout your firm

In study after study, strategic thinkers are found to be among the most highly effective leaders. But is there a way to encourage routine strategic thinking throughout an organization?

| Mar 27, 2014

16 kitchen and bath design trends for 2014

Work on multifamily housing projects? Here are the top kitchen and bath design trends, according to a survey of more than 420 kitchen and bath designers. 

| Mar 26, 2014

A sales and service showcase

High Plains Equipment, a Case IH dealership in Devils Lake, N.D., constructs a larger facility to better serve its customers.

| Mar 26, 2014

Free transit for everyone! Then again, maybe not

An interesting experiment is taking place in Tallinn, the capital of Estonia, where, for the last year or so, its 430,000 residents have been able to ride the city’s transit lines practically for free. City officials hope to pump up ridership by 20%, cut carbon emissions, and give low-income Tallinnites greater access to job opportunities. But is it working?

| Mar 26, 2014

Callison launches sustainable design tool with 84 proven strategies

Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com. 

| Mar 26, 2014

Zaha Hadid's glimmering 'cultural hub of Seoul' opens with fashion, flair [slideshow]

The new space, the Dongdaemun Design Plaza, is a blend of park and cultural spaces meant for the public to enjoy.

| Mar 26, 2014

First look: Lockheed Martin opens Advanced Materials and Thermal Sciences Center in Palo Alto

The facility will host advanced R&D in emerging technology areas like 3D printing, energetics, thermal sciences, and nanotechnology.

| Mar 25, 2014

Sydney breaks ground on its version of the High Line elevated park [slideshow]

The 500-meter-long park will feature bike paths, study pods, and outdoor workspaces.

Sponsored | | Mar 25, 2014

Johns Hopkins chooses SLENDERWALL for a critical medical facility reconstruction

After decades of wear, the hand-laid brick envelope of the Johns Hopkins nine-story Nelson/Harvey inpatient facility began failing. SLENDERWALL met the requirements for renovation.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021