flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

FMI releases 2012 first quarter construction outlook

FMI releases 2012 first quarter construction outlook

The last time construction put in place was at this level was 2000-2001.


By By BD+C Staff | March 20, 2012

FMI released the first-quarter 2012 Construction Outlook Report forecasting a 5% increase in total construction put in place for 2012 compared to 2011, or $826.3 billion. The last time construction put in place was at this level was 2000-2001.

Despite slow growth projections and rising gasoline prices, the GDP is still growing and consumers are still spending, reflected in the Conference Board's Consumer Confidence Index increasing to 70.8 in February compared to 70.4 a year ago. Along with the Federal Reserve's intervention, these factors have served to keep growth slow and inflation in check.

In order for residential construction to achieve the 8 percent increase projected and top $264.4 billion in 2012, a number of factors still have to fall into place:

  • Reduction in the current inventory of homes
  • Lenders willing to lend on reasonable terms
  • Steady improvement in hiring

Projections indicate a 4% increase in nonresidential buildings for 2012, topping $341 billion, with slightly higher growth in 2013 to $361 billion. Nonresidential contractors are facing many of the same problems as residential contractors. In addition, competition is fierce, with low price still the name of the game. Project owners who are ready to restart their building programs are expecting hungry contractors to submit very low bids. One of the keys for growth will be the return of private investment in construction. Additionally, federal, state and local government construction have been dialed back until budgets are in better repair and tax revenues return to levels that are more normal. Research indicates that there are signs this is starting to happen. BD+C

Related Stories

| Apr 3, 2014

Security, accountability, and cloud access: Can you really have it all?

I’ve heard countless stories of conversations between project engineers and IT professionals who can’t come to an agreement on the level of security needed to protect their data while making it more accessible—not only externally, but also internally. 

| Apr 2, 2014

The new model of healthcare facility management

A growing number of healthcare organizations are moving to an integrated real estate model in an effort to better manage costs, respond to regulatory requirements, and support changes in patient care delivery.

| Apr 2, 2014

8 tips for avoiding thermal bridges in window applications

Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.

| Apr 2, 2014

Check out the stunning research facility just named 2014 Lab of the Year [slideshow]

NREL's Energy Systems Integration Facility takes top honors in R&D Magazine's 48th annual lab design awards. 

| Apr 1, 2014

The risks of mismatched fire-rated assemblies

Mismatched fire-rated glass and framing happens more often than you think. Failing to confirm that the tested and listed performance capabilities of the framing system match those of the glazing can create a financial nightmare for the entire building team. 

| Apr 1, 2014

Planned global commerce center breaks ground near Phoenix

When completed, PhoenixMart will be one of the largest single-level trade centers in the U.S. 

| Apr 1, 2014

Paints, coatings and sealants: Choosing products and procedures for best performance

This course covers life cycle assessment, color selection, emissions, durability, resilience, corrosion resistance, specification standards, and other critical aspects of choosing coatings for interior and exterior walls, ceilings, and roofs.

| Mar 31, 2014

Extreme conversion: Soaring Canadian church transformed into contemporary library

Even before the St. Denys-du-Plateau Church was converted into a library, it was an unusual building, with a towering nave designed to mimic a huge tent inflated by the wind. 

| Mar 31, 2014

Tips for creating a competitive bid using codes and loads

Landing a project feels like winning a prize, sort of like finding that forgotten $20 bill in the pocket of a pair of jeans you haven’t worn in a while. But living on the “chance” of winning a job isn’t a great way to pay your electric bill. So, how do you swing the chances in your favor?

Sponsored | | Mar 30, 2014

Ontario Leisure Centre stays ahead of the curve with channel glass

The new Bradford West Gwillimbury Leisure Centre features a 1,400-sf serpentine channel glass wall that delivers dramatic visual appeal for its residents.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021